8100 Vinewood Ln
Austin, TX 78757
8100 Vinewood Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 8100 Vinewood Ln, Austin, TX 78757. The most recent, filed February 27, 2024, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Feb 27, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 27, 2024
- since Feb 27, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedFeb 26, 2024
- IssuedFeb 27, 2024
- WorkFeb '24 – Sep '24
- Final inspectionSep 17, 2024
Passed final inspection Sep 17, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-023551 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8100 Vinewood Ln
What is being built at 8100 Vinewood Ln?
The latest filing (City of Austin permit 2024-023551 PP, February 27, 2024) covers replacement of an existing water heater.
How many permits and filings does 8100 Vinewood Ln have?
1 filing across 1 project, from February 27, 2024 to February 27, 2024.
Is there other construction near 8100 Vinewood Ln?
Yes. Nearby filings include 3004 Vinewood Cv (replacement of an existing water heater replace 40-gallon gas water heater location: interior closet, Nov 16, 2026); 8106 Vinewood Ln (60 tunnel below the foundation to replace entire cast iron drain system. 3 access holes - front right back, Apr 1, 2025); 3009 Firwood Dr (request to disconnect: install automatic transfer switch next to existing overhead 200 amp meter can. meter can to remain. run conduit/wire form automatic transfer switch to existing panel. run wire out of automatic transfer switch to generator, Jun 18, 2025).
How do I get alerts for new permits at 8100 Vinewood Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 3004 Vinewood CvNov 16, 2026Replacement of an existing water heater replace 40-gallon gas water heater location: interior closet · 41 m away
- 8106 Vinewood LnApr 1, 202560 tunnel below the foundation to replace entire cast iron drain system. 3 access holes - front right back · 56 m away
- 3009 Firwood DrJun 18, 2025Request to disconnect: install automatic transfer switch next to existing overhead 200 amp meter can. meter can to remain. run conduit/wire form automatic transfer switch to existing panel. run wire out of automatic transfer switch to generator · 61 m away
- 3010 Firwood DrFeb 14, 2024Replacement of an existing ng water heater · 92 m away
- 3006 Boxdale DrFeb 15, 2024Replace cast iron pipe with pvc pipe under a house · 110 m away
- 8102 Rockwood LnJan 26, 2026125 amp mb outdoor panel - siemans economy series and 125 amp overhead riser thru roof. riser is not being moved. it is an upgrade rigid pipe through the roof · 123 m away
- 8018 Rockwood LnMay 12, 2026Upgrade main electrical panel and meter · 123 m away
- 3004 Boxdale DrSep 4, 2025Install/replace 200 amp main breaker panel and meter can (overhead) · 123 m away
- 3101 Steck AveApr 24, 2025Express - demolition kitchen remodel bathroom remodel doors and windows size for size replacement replace flooring paint interior and exterior · 126 m away
- 3103 Steck AveJan 7, 2025Trenching 42 lf and tunneling 42lf to correct wastewater line breaks and areas holding water as indicated on the drawing · 127 m away
- 3009 Steck AveDec 18, 2025Repair existing sewer line only · 131 m away
- 8014 Rockwood LnSep 21, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 137 m away