5910 Carleen Dr
Austin, TX 78757
Drain-line work permitted at 5910 Carleen Dr
An Austin plumbing permit dated March 30, 2026, records about 25 feet of tunneling to reroute the home's drain system to the main sewer line; the permit is marked final. An earlier mechanical permit, dated October 27, 2025, for replacing the central heat and air system is marked expired.
Summarized from City of Austin records · updated Mar 30, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Mar 30, 2026
- since Oct 27, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledCreate entry tunnel(s) to replumb/re-route complete drain system up to bottom of foundation and out to main sewer line. approx 25ft of tunnel
- AppliedMar 26, 2026
- IssuedMar 30, 2026
- WorkMar '26 – Apr '26
- Final inspectionApr 22, 2026
Passed final inspection Apr 22, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsCreate entry tunnel(s) to replumb/re-route complete drain system up to bottom of foundation and out to main sewer line. approx 25ft of tunnel
Create entry tunnel(s) to replumb/re-route complete drain system up to bottom of foundation and out to main sewer line. approx 25ft of tunnel
City of Austin permitPlumbing PermitFinal- Record
- 2026-036577 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2025-133104 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5910 Carleen Dr
What is being built at 5910 Carleen Dr?
The available Austin permits describe home repair work, not a new building. A March 30, 2026 plumbing permit records about 25 feet of tunneling to reroute the drain system to the main sewer line.
What work was permitted at 5910 Carleen Dr in 2026?
Permit 2026-036577 PP, dated March 30, 2026, covers entry tunnels to reroute the complete drain system to the main sewer line. It is marked final.
Is a new house being built at 5910 Carleen Dr?
The records provided do not list a new-home construction permit. They describe drain-system work and an earlier permit for replacing the central heat and air system.
Was a plumbing permit issued for 5910 Carleen Dr?
Yes. Austin permit 2026-036577 PP was filed March 30, 2026, for about 25 feet of tunneling related to rerouting the drain system. Its status is final.
Was the HVAC replacement at 5910 Carleen Dr approved?
Austin mechanical permit 2025-133104 MP, dated October 27, 2025, describes replacement of the existing central heat and air system, with or without duct work. The permit is marked expired.
Also being built nearby
All of 78757- 5906 Carleen DrJan 12, 2024Replacement of complete existing central heat and air system with or without duct work · 50 m away
- 5721 Marilyn DrOct 30, 2025Express - foundation repair on a slab foundation. install 21 total press piling piers including 17 permiter piers and 4 interior locations. there will be 7 breakthrough and patched locations. we will improve level to the extent · 52 m away
- 5914 Carleen DrMay 7, 202610 tunnel below the foundation to replace the kitchen drain line. 1 access hole - right · 53 m away
- 5907 Carleen DrNov 22, 2023Tee into external gas line and run additional line for generator installation · 57 m away
- 5805 Marilyn DrSep 26, 2024Install lawn irrigation · 70 m away
- 5719 Marilyn DrJun 4, 2024Replacement of an existing water heater repipe all water drops from slab to attic overhead modify gas pipe for stove install dedicated recirculating hot water line · 73 m away
- 5915 Carleen DrApr 29, 2024Irrigation system installation · 91 m away
- 5902 Carleen DrJun 27, 2025Replacement of complete existing central heat and air system with or without duct work · 100 m away
- 5903 Carleen DrAug 26, 2026343 square foot extension of existing carport including two new columns and footings · 103 m away
- 5802 Marilyn DrApr 29, 2024Tunnel front to back both sides approximately 117 feet for repair job · 105 m away
- 5917 Carleen DrJun 17, 2026Replacement of an existing water heater new water heater change out 5917 carleen drive austin tx 78757 · 110 m away
- 5920 Carleen DrJul 29, 2025Replace the cast iron piping by tunneling 90 feet through the kitchen laundry and bathroom using sch 40 pvc. one access hole by the kitchen one access hole by the bathroom. no sheetrock removal · 121 m away