groundranger
Historic · latest filing Apr 2024Residential

5802 Marilyn Dr

Austin, TX 78757

5802 Marilyn Dr: 1 project on record

City of Austin lists 1 filing across 1 project at 5802 Marilyn Dr, Austin, TX 78757. The most recent, filed April 29, 2024, covers: “Tunnel front to back both sides approximately 117 feet for repair job”.

Compiled from City of Austin records · updated Apr 29, 2024

Projects
1
1 filings
Latest filing
Apr 29, 2024
since Apr 29, 2024
Largest scope
—
Listed value
—

Where this project stands

Permit expired

Tunnel front to back both sides approximately 117 feet for repair job

  1. AppliedApr 18, 2024
  2. IssuedApr 29, 2024
  3. !WorkApr '24 – Oct '24
  4. Final inspection

Marked expired Oct 30, 2024.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Tunnel front to back both sides approximately 117 feet for repair job

    Tunnel front to back both sides approximately 117 feet for repair job

    City of Austin permitPlumbing PermitExpired
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5802 Marilyn Dr

What is being built at 5802 Marilyn Dr?

The latest filing (City of Austin permit 2024-048538 PP, April 29, 2024) covers tunnel front to back both sides approximately 117 feet for repair job.

How many permits and filings does 5802 Marilyn Dr have?

1 filing across 1 project, from April 29, 2024 to April 29, 2024.

Is there other construction near 5802 Marilyn Dr?

Yes. Nearby filings include 5806 Marilyn Dr (200 amp overhead service upgrade, Oct 1, 2026); 5717 Louise Ln (this project consists of installing a new grid-interactive photovoltaic and energy-storage system at 5717 louise ln austin tx in accordance with the attached planset and the. work includes electrical installation of a new 9.680 kw dc / 16.0 kw ac pv system consisting of (22) phono draco ps440m8gf-18/vnh modules each equipped with tigo ts4-a-o optimizers interconnected to a new eg4 flexboss 21 hybrid inverter. two eg4 14.3 kwh powerpro batteries and associated eg4 battery conduit boxes will be installed to provide whole-home backup via the eg4 gridboss gateway. all battery equipment is ul 9540 certified as shown in the planset. work includes routing new dc homeruns to a roof-mounted junction box installing an imo 4-pole dc disconnect installing ac conductors between the inverter gridboss and the existing 200a main service panel and landing the system on a dedicated backfeed breaker sized per inverter specifications. all grounding and bonding will follow nec 250 and 690 requirements. rapid shutdown functionality per nec 690.12 will be provided through module-level electronics. the existing pv systemcomprised of (30) canadian solar cs6k-280m modules with p300 optimizers a solaredge se7600 inverter pv meter and existing ac disconnectwill remain in place. no service upgrade main breaker derate structural modifications or roofing penetrations beyond those shown on the plans are included. all work will follow manufacturer installation requirements maintain nec-required clearances and be inspected prior to energization, Dec 15, 2025); 5715 Louise Ln (dig with excavator and hands cut a concrete portion garage sidewalk and replace 45 ft of 4 cast iron pipe with pvc 1. 45 ft long 2. 4 cast iron pipe 3. big roots in middle way 4. 811 marks will be needed 5. permits and testing will be required 6. cover everything after finish, Feb 19, 2025).

How do I get alerts for new permits at 5802 Marilyn Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78757
Email me when a new permit is filed