City of Austin lists 1 filing across 1 project at 5720 Louise Ln, Austin, TX 78757. The most recent, filed December 14, 2023, covers: “Replace water line from the meter to the house”.
Compiled from City of Austin records · updated Dec 14, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 14, 2023
- since Dec 14, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace water line from the meter to the house
- AppliedDec 12, 2023
- IssuedDec 14, 2023
- WorkDec '23 – Dec '23
- Final inspectionDec 15, 2023
Passed final inspection Dec 15, 2023.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace water line from the meter to the house
Replace water line from the meter to the house
City of Austin permitPlumbing PermitFinal- Record
- 2023-158546 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5720 Louise Ln
What is being built at 5720 Louise Ln?
The latest filing (City of Austin permit 2023-158546 PP, December 14, 2023) covers replace water line from the meter to the house.
How many permits and filings does 5720 Louise Ln have?
1 filing across 1 project, from December 14, 2023 to December 14, 2023.
Is there other construction near 5720 Louise Ln?
Yes. Nearby filings include 5718 Louise Ln (main panel changeout, Sep 28, 2026); 5721 Louise Ln (excavate 40 tunnel and repair all the cast iron that left in this house. its about 30 ft and then we will have to jet the kitchen line all the way to the clean out and from the clean out to the city, Mar 3, 2025); 5704 Susie Ct (new inground swimming pool with reqd enclosure device, Aug 6, 2025).
How do I get alerts for new permits at 5720 Louise Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 5718 Louise LnSep 28, 2026Main panel changeout · 24 m away
- 5721 Louise LnMar 3, 2025Excavate 40 tunnel and repair all the cast iron that left in this house. its about 30 ft and then we will have to jet the kitchen line all the way to the clean out and from the clean out to the city · 43 m away
- 5704 Susie CtAug 6, 2025New inground swimming pool with reqd enclosure device · 61 m away
- 5717 Louise LnDec 15, 2025This project consists of installing a new grid-interactive photovoltaic and energy-storage system at 5717 louise ln austin tx in accordance with the attached planset and the. work includes electrical installation of a new 9.680 kw dc / 16.0 kw ac pv system consisting of (22) phono draco ps440m8gf-18/vnh modules each equipped with tigo ts4-a-o optimizers interconnected to a new eg4 flexboss 21 hybrid inverter. two eg4 14.3 kwh powerpro batteries and associated eg4 battery conduit boxes will be installed to provide whole-home backup via the eg4 gridboss gateway. all battery equipment is ul 9540 certified as shown in the planset. work includes routing new dc homeruns to a roof-mounted junction box installing an imo 4-pole dc disconnect installing ac conductors between the inverter gridboss and the existing 200a main service panel and landing the system on a dedicated backfeed breaker sized per inverter specifications. all grounding and bonding will follow nec 250 and 690 requirements. rapid shutdown functionality per nec 690.12 will be provided through module-level electronics. the existing pv systemcomprised of (30) canadian solar cs6k-280m modules with p300 optimizers a solaredge se7600 inverter pv meter and existing ac disconnectwill remain in place. no service upgrade main breaker derate structural modifications or roofing penetrations beyond those shown on the plans are included. all work will follow manufacturer installation requirements maintain nec-required clearances and be inspected prior to energization · 62 m away
- 5803 Fairlane DrMay 31, 202660 amp circuit for tesla ev charger located in the garage. main panel is located on backside of home. conduit will be routed through the attic space from main electrical panel to ev charger location in garage · 63 m away
- 5702 Susie CtDec 4, 2024Install a new exhaust vent · 66 m away
- 5715 Louise LnFeb 19, 2025Dig with excavator and hands cut a concrete portion garage sidewalk and replace 45 ft of 4 cast iron pipe with pvc 1. 45 ft long 2. 4 cast iron pipe 3. big roots in middle way 4. 811 marks will be needed 5. permits and testing will be required 6. cover everything after finish · 80 m away
- 5806 Marilyn DrOct 1, 2026200 amp overhead service upgrade · 93 m away
- 5711 Fairlane DrAug 28, 2026Base: installing a backup battery system and additional meter socket · 102 m away
- 5802 Marilyn DrApr 29, 2024Tunnel front to back both sides approximately 117 feet for repair job · 104 m away
- 5707 Fairlane DrNov 4, 2026New construction of 1 story accessory structure · 106 m away
- 5710 Fairlane DrFeb 25, 2026Gas line for standby generator installation · 109 m away