Permit covers a 60-amp Tesla charger circuit at 5803 Fairlane Dr
An Austin electrical permit filed May 31, 2026, covers a 60-amp circuit for a Tesla EV charger in the home's garage. Permit 2026-065340 EP is marked final.
Summarized from City of Austin records · updated May 31, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 31, 2026
- since May 31, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled60 amp circuit for tesla ev charger located in the garage. main panel is located on backside of home. conduit will be routed through the attic space from main electrical panel to ev charger location in garage
- AppliedMay 22, 2026
- IssuedMay 31, 2026
- WorkMay '26 – Jun '26
- Final inspectionJun 12, 2026
Passed final inspection Jun 12, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 project60 amp circuit for tesla ev charger located in the garage. main panel is located on backside of home. conduit will be routed through the attic space from main electrical panel to ev charger location in garage
60 amp circuit for tesla ev charger located in the garage. main panel is located on backside of home. conduit will be routed through the attic space from main electrical panel to ev charger location in garage
City of Austin permitElectrical PermitFinal- Record
- 2026-065340 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5803 Fairlane Dr
What is being built at 5803 Fairlane Dr?
An electrical permit covers a 60-amp circuit for a Tesla EV charger in the garage. Permit 2026-065340 EP was filed May 31, 2026, and is marked final.
Is a new home being built at 5803 Fairlane Dr?
The record is for electrical work, not a new home. It covers a 60-amp circuit for a garage EV charger.
What does permit 2026-065340 EP cover?
The City of Austin permit covers a 60-amp circuit for a Tesla EV charger in the garage at 5803 Fairlane Dr. It was filed May 31, 2026, and is marked final.
When was the EV charger permit filed for 5803 Fairlane Dr?
The City of Austin filed permit 2026-065340 EP on May 31, 2026. The permit status is final.
Is a Tesla charger being installed at 5803 Fairlane Dr?
The permit description specifies a 60-amp circuit for a Tesla EV charger located in the garage. It does not provide an installation completion date.
Also being built nearby
All of 78757- 5720 Louise LnDec 14, 2023Replace water line from the meter to the house · 63 m away
- 5721 Louise LnMar 3, 2025Excavate 40 tunnel and repair all the cast iron that left in this house. its about 30 ft and then we will have to jet the kitchen line all the way to the clean out and from the clean out to the city · 74 m away
- 5718 Louise LnSep 28, 2026Main panel changeout · 86 m away
- 5810 Marilyn DrFeb 18, 2025Addition & remodel of 1 story residence: remodel of two adjacent bathrooms kitchen/living area and 2 out of 4 bedrooms. addition of rear covered porch · 97 m away
- 5806 Marilyn DrOct 1, 2026200 amp overhead service upgrade · 108 m away
- 5717 Louise LnDec 15, 2025This project consists of installing a new grid-interactive photovoltaic and energy-storage system at 5717 louise ln austin tx in accordance with the attached planset and the. work includes electrical installation of a new 9.680 kw dc / 16.0 kw ac pv system consisting of (22) phono draco ps440m8gf-18/vnh modules each equipped with tigo ts4-a-o optimizers interconnected to a new eg4 flexboss 21 hybrid inverter. two eg4 14.3 kwh powerpro batteries and associated eg4 battery conduit boxes will be installed to provide whole-home backup via the eg4 gridboss gateway. all battery equipment is ul 9540 certified as shown in the planset. work includes routing new dc homeruns to a roof-mounted junction box installing an imo 4-pole dc disconnect installing ac conductors between the inverter gridboss and the existing 200a main service panel and landing the system on a dedicated backfeed breaker sized per inverter specifications. all grounding and bonding will follow nec 250 and 690 requirements. rapid shutdown functionality per nec 690.12 will be provided through module-level electronics. the existing pv systemcomprised of (30) canadian solar cs6k-280m modules with p300 optimizers a solaredge se7600 inverter pv meter and existing ac disconnectwill remain in place. no service upgrade main breaker derate structural modifications or roofing penetrations beyond those shown on the plans are included. all work will follow manufacturer installation requirements maintain nec-required clearances and be inspected prior to energization · 115 m away
- 5702 Susie CtDec 4, 2024Install a new exhaust vent · 120 m away
- 5704 Susie CtAug 6, 2025New inground swimming pool with reqd enclosure device · 122 m away
- 5711 Fairlane DrAug 28, 2026Base: installing a backup battery system and additional meter socket · 128 m away
- 5710 Fairlane DrFeb 25, 2026Gas line for standby generator installation · 129 m away
- 5901 Fairlane DrOct 27, 2026New construction 2-unit use duplex; unit b: 2-story 1 bedroom 1 bath with covered front porch and interior stairs leading to 2nd floor · 131 m away
- 5708 Fairlane DrNov 25, 202512 trench thru yard to replace section of orangeburg yard sewer · 132 m away