6108 Laird Dr
Austin, TX 78757
6108 Laird Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 6108 Laird Dr, Austin, TX 78757. The most recent, filed August 15, 2025, covers: “Sewer yard line replacement 4 pvc up to 40 with new cleanouts in the back of home leading to an easement”.
Compiled from City of Austin records · updated Aug 15, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 15, 2025
- since Aug 15, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledSewer yard line replacement 4 pvc up to 40 with new cleanouts in the back of home leading to an easement
- AppliedAug 13, 2025
- IssuedAug 15, 2025
- WorkAug '25 – Sep '25
- Final inspectionSep 8, 2025
Passed final inspection Sep 8, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectSewer yard line replacement 4 pvc up to 40 with new cleanouts in the back of home leading to an easement
Sewer yard line replacement 4 pvc up to 40 with new cleanouts in the back of home leading to an easement
City of Austin permitPlumbing PermitFinal- Record
- 2025-102705 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6108 Laird Dr
What is being built at 6108 Laird Dr?
The latest filing (City of Austin permit 2025-102705 PP, August 15, 2025) covers sewer yard line replacement 4 pvc up to 40 with new cleanouts in the back of home leading to an easement.
How many permits and filings does 6108 Laird Dr have?
1 filing across 1 project, from August 15, 2025 to August 15, 2025.
What is being built near Northwest Center Mixed Use Retail Center in Austin?
6108 Laird Dr is about 109 m from Northwest Center Mixed Use Retail Center (6111 N. Burnet Road). Its latest filing is for sewer yard line replacement 4 pvc up to 40 with new cleanouts in the back of home leading to an easement.
Is there other construction near 6108 Laird Dr?
Yes. Nearby filings include 6106 Laird Dr (replacement of complete existing central heat and air system with or without duct work, Dec 18, 2024); 6104 Laird Dr (excavate 36 to repair break in the yard line, Sep 30, 2026); 6105 Burnet Rd (asahi imports, Mar 2, 2007).
How do I get alerts for new permits at 6108 Laird Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 6106 Laird DrDec 18, 2024Replacement of complete existing central heat and air system with or without duct work · 16 m away
- 6104 Laird DrSep 30, 2026Excavate 36 to repair break in the yard line · 36 m away
- 6105 Burnet RdMar 2, 2007Asahi imports · 60 m away
- 2012 Alguno RdDec 3, 2025Express: replace 100 sq ft of decking and replace roof shingles · 63 m away
- 6100 Laird DrMar 17, 2025Install new roof-mounted solar and energy storage system to existing single family residence. overhead ae · 68 m away
- 2010 Alguno RdAug 11, 2025Service upgrade interior panel replacement replace non grounded receptacles and add 240v dedicated circuit for car outlet · 85 m away
- 6206 Laird DrFeb 9, 2025Unit b 2nd story addition on existing duplex office addition on existing carport · 98 m away
- 6205 Burnet RdMay 28, 2024Replace existing tpo membrane from hail damage april 9 2024. remove existing.60 mil. tpo and replace with new.60 mil. tpo using tpo bonding adhesive for fully adhered system. no structural changes · 100 m away
- 2011 Alegria RdFeb 7, 2024Install 120v for dishwasherexterior gfci for wh. install 240v.for dryer replace 15amp gfci and light in kitchen area. upgrade meter loop to 200amp · 101 m away
- 2008 Alguno RdOct 13, 2026Replacement of complete existing central heat and air system with or without duct work 3 ton condenser changeout in the backyard with indoor coil plus 44k btus furnace changeout in the attic · 103 m away
- 6225 Burnet RdOct 28, 2026Replace 90 of sewer line in the back of the building · 106 m away
- 6004 Laird DrFeb 19, 2025New attached carport · 106 m away