6106 Laird Dr
Austin, TX 78757
6106 Laird Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 6106 Laird Dr, Austin, TX 78757. The most recent, filed December 18, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Dec 18, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 18, 2024
- since Dec 18, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of complete existing central heat and air system with or without duct work
- AppliedDec 10, 2024
- IssuedDec 18, 2024
- !WorkDec '24 – Jun '25
- Final inspection
Marked expired Jun 17, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2024-161069 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6106 Laird Dr
What is being built at 6106 Laird Dr?
The latest filing (City of Austin permit 2024-161069 MP, December 18, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 6106 Laird Dr have?
1 filing across 1 project, from December 18, 2024 to December 18, 2024.
What is being built near Northwest Center Mixed Use Retail Center in Austin?
6106 Laird Dr is about 101 m from Northwest Center Mixed Use Retail Center (6111 N. Burnet Road). Its latest filing is for replacement of complete existing central heat and air system with or without duct work.
Is there other construction near 6106 Laird Dr?
Yes. Nearby filings include 6108 Laird Dr (sewer yard line replacement 4 pvc up to 40 with new cleanouts in the back of home leading to an easement, Aug 15, 2025); 6104 Laird Dr (excavate 36 to repair break in the yard line, Sep 30, 2026); 6100 Laird Dr (install new roof-mounted solar and energy storage system to existing single family residence. overhead ae, Mar 17, 2025).
How do I get alerts for new permits at 6106 Laird Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 6108 Laird DrAug 15, 2025Sewer yard line replacement 4 pvc up to 40 with new cleanouts in the back of home leading to an easement · 16 m away
- 6104 Laird DrSep 30, 2026Excavate 36 to repair break in the yard line · 20 m away
- 6100 Laird DrMar 17, 2025Install new roof-mounted solar and energy storage system to existing single family residence. overhead ae · 51 m away
- 6105 Burnet RdMar 2, 2007Asahi imports · 53 m away
- 2012 Alguno RdDec 3, 2025Express: replace 100 sq ft of decking and replace roof shingles · 53 m away
- 2010 Alguno RdAug 11, 2025Service upgrade interior panel replacement replace non grounded receptacles and add 240v dedicated circuit for car outlet · 74 m away
- 6004 Laird DrFeb 19, 2025New attached carport · 90 m away
- 2008 Alguno RdOct 13, 2026Replacement of complete existing central heat and air system with or without duct work 3 ton condenser changeout in the backyard with indoor coil plus 44k btus furnace changeout in the attic · 93 m away
- 6111 Burnet RdMar 5, 2025Interior remodel/expansion of existing pharmacy · 101 m away
- 6111 N. Burnet Road · Northwest Center Mixed Use Retail CenterNov 22, 2024Nucara compounding pharmacy expansion — renovation/alteration — interior remodel/expansion to an existing pharmacy · 101 m away
- 6109 Burnet RdMar 31, 2025This permit will be for replacing the ground wiring on numerous existing electric services at northwet shopping center at 6109 burnet road which is the address for the house electric meter. there are five services that have the ground wire stolen from them and these are the only ones to be repaired under this permit. this is due to vandalism and theft of copper wire · 102 m away
- 6205 Burnet RdMay 28, 2024Replace existing tpo membrane from hail damage april 9 2024. remove existing.60 mil. tpo and replace with new.60 mil. tpo using tpo bonding adhesive for fully adhered system. no structural changes · 105 m away