groundranger
Historic · latest filing Mar 2025Commercial

6109 Burnet Rd

Austin, TX 78757

Electrical ground-wire repairs permitted at 6109 Burnet Road

An Austin permit filed March 31, 2025, covers replacing stolen ground wiring on five existing electric services at 6109 Burnet Road. The permit describes repairs related to vandalism and copper-wire theft; it does not indicate new construction.

Summarized from City of Austin records · updated Mar 31, 2025

Projects
1
1 filings
Latest filing
Mar 31, 2025
since Mar 31, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

This permit will be for replacing the ground wiring on numerous existing electric services at northwet shopping center at 6109 burnet road which is the address for the house electric meter. there are five services that have the ground wire stolen from them and these are the only ones to be repaired under this permit. this is due to vandalism and theft of copper wire

  1. AppliedMar 27, 2025
  2. IssuedMar 31, 2025
  3. WorkMar '25 – Apr '25
  4. Final inspectionApr 22, 2025

Passed final inspection Apr 22, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. This permit will be for replacing the ground wiring on numerous existing electric services at northwet shopping center at 6109 burnet road which is the address for the house electric meter. there are five services that have the ground wire stolen from them and these are the only ones to be repaired under this permit. this is due to vandalism and theft of copper wire

    This permit will be for replacing the ground wiring on numerous existing electric services at northwet shopping center at 6109 burnet road which is the address for the house electric meter. there are five services that have the ground wire stolen from them and these are the only ones to be repaired under this permit. this is due to vandalism and theft of copper wire

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6109 Burnet Rd

What is happening at 6109 Burnet Road?

An electrical permit covers replacing ground wiring on five existing electric services. It was filed March 31, 2025, under permit 2025-036983 EP.

Is anything new being built at 6109 Burnet Road?

The permit describes repairs to existing electrical services, not a new building. It does not list a project size or valuation.

Why are the electrical services being repaired?

The permit says ground wires were stolen from five services and that the repairs are due to vandalism and copper-wire theft.

What does permit 2025-036983 EP cover?

The City of Austin permit covers replacing ground wiring on five existing electric services at 6109 Burnet Road. The permit was filed March 31, 2025, and its status is Final.

What work is happening near Northwest Center Mixed Use Retail Center?

At 6109 Burnet Road, a permit covers replacing stolen ground wires on five existing electric services. The filing date was March 31, 2025.

Is a new store opening at 6109 Burnet Road?

The available permit does not mention a new store or tenant. It describes electrical repairs to existing services.

Also being built nearby

All of 78757
Email me when a new permit is filed