8015 Bon Air Dr
Austin, TX 78757
8015 Bon Air Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 8015 Bon Air Dr, Austin, TX 78757. The most recent, filed September 11, 2025, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Sep 11, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 11, 2025
- since Sep 11, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedSep 9, 2025
- IssuedSep 11, 2025
- WorkSep '25 – Nov '25
- Final inspectionNov 3, 2025
Passed final inspection Nov 3, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2025-114879 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8015 Bon Air Dr
What is being built at 8015 Bon Air Dr?
The latest filing (City of Austin permit 2025-114879 PP, September 11, 2025) covers replacement of an existing water heater.
How many permits and filings does 8015 Bon Air Dr have?
1 filing across 1 project, from September 11, 2025 to September 11, 2025.
Is there other construction near 8015 Bon Air Dr?
Yes. Nearby filings include 8013 Bon Air Dr (**relocate of existing kit/laundry drain lines to exterior, Nov 3, 2025); 8008 Bon Air Dr (express: shower to shower replacement (prefab base) in the same location without relocating any plumbing, Apr 7, 2026); 1704 Wooten Dr (replacement of complete existing central heat and air system with or without duct work, Jul 8, 2024).
How do I get alerts for new permits at 8015 Bon Air Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 8013 Bon Air DrNov 3, 2025**relocate of existing kit/laundry drain lines to exterior · 21 m away
- 8008 Bon Air DrApr 7, 2026Express: shower to shower replacement (prefab base) in the same location without relocating any plumbing · 69 m away
- 1704 Wooten DrJul 8, 2024Replacement of complete existing central heat and air system with or without duct work · 75 m away
- 8100 Burrell DrOct 3, 2024Replace sewer yard line from house connection to city tap · 85 m away
- 1801 Wooten DrMar 9, 2026Replacement of complete existing central heat and air system with or without duct work **add insulation · 88 m away
- 1801 Pompton DrJun 26, 2025Water heater replacement · 92 m away
- 8102 Burrell DrMay 27, 2026Replacement of the old and deteriorate cast iron pipe for a pier beam house replacement all drainage pipe for underneath the house · 95 m away
- 1803 Palmwood CvSep 23, 2026(maloney alan) - installation of circuit for elec. vehicle charging station - esip · 107 m away
- 8104 Burrell DrOct 3, 2024Replace sewer yard line from house connection to city tap · 110 m away
- 1802 Wooten DrOct 29, 2026In ground pool and concrete deck · 119 m away
- 8106 Burrell DrNov 18, 2024Replace sewer yard line from house connection to city tap approximately 85 long · 128 m away
- 1805 Wooten DrSep 3, 2026200 amp service upgrade · 132 m away