8106 Burrell Dr
Austin, TX 78757
8106 Burrell Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 8106 Burrell Dr, Austin, TX 78757. The most recent, filed November 18, 2024, covers: “Replace sewer yard line from house connection to city tap approximately 85 long”.
Compiled from City of Austin records · updated Nov 18, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 18, 2024
- since Nov 18, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace sewer yard line from house connection to city tap approximately 85 long
- AppliedOct 28, 2024
- IssuedNov 18, 2024
- WorkNov '24 – Feb '25
- Final inspectionFeb 27, 2025
Passed final inspection Feb 27, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace sewer yard line from house connection to city tap approximately 85 long
Replace sewer yard line from house connection to city tap approximately 85 long
City of Austin permitPlumbing PermitFinal- Record
- 2024-144659 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8106 Burrell Dr
What is being built at 8106 Burrell Dr?
The latest filing (City of Austin permit 2024-144659 PP, November 18, 2024) covers replace sewer yard line from house connection to city tap approximately 85 long.
How many permits and filings does 8106 Burrell Dr have?
1 filing across 1 project, from November 18, 2024 to November 18, 2024.
Is there other construction near 8106 Burrell Dr?
Yes. Nearby filings include 8108 Burrell Dr (replace sewer yard line from house connection to city tap, Oct 3, 2024); 8104 Burrell Dr (replace sewer yard line from house connection to city tap, Oct 3, 2024); 1515 Beckett St (replaced galvanized water line with pex, Dec 7, 2023).
How do I get alerts for new permits at 8106 Burrell Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 8108 Burrell DrOct 3, 2024Replace sewer yard line from house connection to city tap · 25 m away
- 8104 Burrell DrOct 3, 2024Replace sewer yard line from house connection to city tap · 25 m away
- 1515 Beckett StDec 7, 2023Replaced galvanized water line with pex · 31 m away
- 8110 Burrell DrOct 29, 2024Replace existing main electrical service with new riser meter can and disconnect. all grounding and bonding as required · 37 m away
- 8102 Burrell DrMay 27, 2026Replacement of the old and deteriorate cast iron pipe for a pier beam house replacement all drainage pipe for underneath the house · 50 m away
- 8215 Burrell DrAug 21, 2025Replacement of complete existing central heat and air system with or without duct work · 66 m away
- 8100 Burrell DrOct 3, 2024Replace sewer yard line from house connection to city tap · 75 m away
- 1509 Beckett StJul 4, 2025New irrigation installation on landscape areas · 85 m away
- 1803 Palmwood CvSep 23, 2026(maloney alan) - installation of circuit for elec. vehicle charging station - esip · 102 m away
- 1507 Beckett StApr 6, 202645 tunnel below the foundation to replace entire drain system. 1 access hole on left · 107 m away
- 1802 Palmwood CvApr 25, 2024Changing 150 amp service to 200 amp service.includes changing 150 amp main breaker in main panel to 200 amp breaker and changing 150 main breaker panel to 200 amp main breaker panel · 116 m away
- 1704 Wooten DrJul 8, 2024Replacement of complete existing central heat and air system with or without duct work · 122 m away