8108 Burrell Dr
Austin, TX 78757
8108 Burrell Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 8108 Burrell Dr, Austin, TX 78757. The most recent, filed October 3, 2024, covers: “Replace sewer yard line from house connection to city tap”.
Compiled from City of Austin records · updated Oct 3, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 3, 2024
- since Oct 3, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace sewer yard line from house connection to city tap
- AppliedSep 30, 2024
- IssuedOct 3, 2024
- WorkOct '24 – Feb '25
- Final inspectionFeb 25, 2025
Passed final inspection Feb 25, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace sewer yard line from house connection to city tap
Replace sewer yard line from house connection to city tap
City of Austin permitPlumbing PermitFinal- Record
- 2024-132174 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8108 Burrell Dr
What is being built at 8108 Burrell Dr?
The latest filing (City of Austin permit 2024-132174 PP, October 3, 2024) covers replace sewer yard line from house connection to city tap.
How many permits and filings does 8108 Burrell Dr have?
1 filing across 1 project, from October 3, 2024 to October 3, 2024.
Is there other construction near 8108 Burrell Dr?
Yes. Nearby filings include 8110 Burrell Dr (replace existing main electrical service with new riser meter can and disconnect. all grounding and bonding as required, Oct 29, 2024); 8106 Burrell Dr (replace sewer yard line from house connection to city tap approximately 85 long, Nov 18, 2024); 1515 Beckett St (replaced galvanized water line with pex, Dec 7, 2023).
How do I get alerts for new permits at 8108 Burrell Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 8110 Burrell DrOct 29, 2024Replace existing main electrical service with new riser meter can and disconnect. all grounding and bonding as required · 13 m away
- 8106 Burrell DrNov 18, 2024Replace sewer yard line from house connection to city tap approximately 85 long · 25 m away
- 1515 Beckett StDec 7, 2023Replaced galvanized water line with pex · 31 m away
- 8215 Burrell DrAug 21, 2025Replacement of complete existing central heat and air system with or without duct work · 42 m away
- 8104 Burrell DrOct 3, 2024Replace sewer yard line from house connection to city tap · 50 m away
- 8102 Burrell DrMay 27, 2026Replacement of the old and deteriorate cast iron pipe for a pier beam house replacement all drainage pipe for underneath the house · 75 m away
- 1509 Beckett StJul 4, 2025New irrigation installation on landscape areas · 86 m away
- 8100 Burrell DrOct 3, 2024Replace sewer yard line from house connection to city tap · 99 m away
- 1802 Palmwood CvApr 25, 2024Changing 150 amp service to 200 amp service.includes changing 150 amp main breaker in main panel to 200 amp breaker and changing 150 main breaker panel to 200 amp main breaker panel · 102 m away
- 1803 Palmwood CvSep 23, 2026(maloney alan) - installation of circuit for elec. vehicle charging station - esip · 103 m away
- 8204 Polar DrOct 29, 2026Replacement of an existing water heater. replace tankless water heater · 106 m away
- 1507 Beckett StApr 6, 202645 tunnel below the foundation to replace entire drain system. 1 access hole on left · 107 m away