City of Austin lists 1 filing across 1 project at 8203 Parkdale Cv, Austin, TX 78757. The most recent, filed December 29, 2023, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Dec 29, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 29, 2023
- since Dec 29, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedDec 29, 2023
- IssuedDec 29, 2023
- WorkDec '23 – Mar '24
- Final inspectionMar 13, 2024
Passed final inspection Mar 13, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2023-164146 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8203 Parkdale Cv
What is being built at 8203 Parkdale Cv?
The latest filing (City of Austin permit 2023-164146 PP, December 29, 2023) covers replacement of an existing water heater.
How many permits and filings does 8203 Parkdale Cv have?
1 filing across 1 project, from December 29, 2023 to December 29, 2023.
Is there other construction near 8203 Parkdale Cv?
Yes. Nearby filings include 8204 Parkdale Cv (replacement of complete existing central heat and air system with or without duct work, Sep 3, 2024); 2530 Steck Ave (construct new driveway approach of 12 ft ***no sidewalk inspection per bp, Apr 9, 2025); 8115 Parkdale Dr (replacement of complete existing central heat and air system with or without duct work, Aug 18, 2026).
How do I get alerts for new permits at 8203 Parkdale Cv?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 8204 Parkdale CvSep 3, 2024Replacement of complete existing central heat and air system with or without duct work · 25 m away
- 2530 Steck AveApr 9, 2025Construct new driveway approach of 12 ft ***no sidewalk inspection per bp · 37 m away
- 8115 Parkdale DrAug 18, 2026Replacement of complete existing central heat and air system with or without duct work · 62 m away
- 2500 Steck AveAug 17, 2026Express-replacing 1 window like for like in existing residential home · 82 m away
- 8113 Parkdale DrApr 2, 2025Express: replace 8 windows like for like · 83 m away
- 2605 Buell AveMar 2, 2007Acratod of austin, inc · 96 m away
- 2505 Steck AveApr 27, 2007North village branch library · 111 m away
- 2600 Clarkdale LnNov 18, 2026New pool · 126 m away
- 8109 Parkdale DrMar 8, 2024Express replace siding · 126 m away
- 2514 Buell AveJul 15, 2026Change of use to daycare - no work being done · 134 m away
- 2701 Steck AveAug 11, 2025A whole house sewer re-pipe. tunnel and yard line · 136 m away
- 2604 Clarkdale LnNov 6, 2026This is separate work from the plumbing permit 2026-099373 pp that we are not associated with. this is warranty work from work we did in the past. there is an open ditch that we need to backfill asap. mary upon arrival met with the excavation crew at 2604 clarkdale ln. austin tx 78757 to perform additional camera diagnostics and establish the excavation location. camera inspections were performed through the kitchen sink vent as well as the laundry vent and laundry drain line. pvc drainage piping was observed throughout the accessible portions of the system with the exception of the kitchen drain line. while inspecting the kitchen drain the camera was advanced to approximately one foot below slab level where a significant separation break or obstruction was encountered. the camera could not be advanced beyond this location preventing further visual confirmation of the downstream piping. based on the camera location and site conditions we determined that accessing the affected area from the front of the home is the most practical approach. this requires approximately one additional foot of excavation compared with accessing the piping through the rear patio. rear access would require disturbing the concrete surrounding the pool area which would be significantly more difficult to restore and match properly. pvc piping was observed penetrating the slab and appears to continue into or through a structural beam beneath the foundation. the suspected failure is located in this general area. the excavation crew will proceed with carefully excavating and gaining access to the affected piping over approximately the next two days. once the piping is fully exposed we will evaluate the exact condition and configuration of the drainage system confirm the cause and extent of the failure and develop the appropriate repair plan based on the conditions found. with the excavation completed and the damaged piping identified · 141 m away