8206 Daleview Dr
Austin, TX 78757
8206 Daleview Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 8206 Daleview Dr, Austin, TX 78757. The most recent, filed September 23, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work change out”.
Compiled from City of Austin records · updated Sep 23, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 23, 2025
- since Sep 23, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work change out
- AppliedSep 22, 2025
- IssuedSep 23, 2025
- WorkSep '25 – Sep '25
- Final inspectionSep 24, 2025
Passed final inspection Sep 24, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work change out
Replacement of complete existing central heat and air system with or without duct work change out
City of Austin permitMechanical PermitFinal- Record
- 2025-120138 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8206 Daleview Dr
What is being built at 8206 Daleview Dr?
The latest filing (City of Austin permit 2025-120138 MP, September 23, 2025) covers replacement of complete existing central heat and air system with or without duct work change out.
How many permits and filings does 8206 Daleview Dr have?
1 filing across 1 project, from September 23, 2025 to September 23, 2025.
Is there other construction near 8206 Daleview Dr?
Yes. Nearby filings include 8204 Daleview Dr (tunnel under the foundation to replace the cast-iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. two access holes are required: one at the cleanout and one at the laundry, Nov 2, 2026); 8202 Millway Dr (tunnel under the foundation to replace the cast iron in bathroom kitchen and laundry with sch 40 pvc, Aug 12, 2025); 8208 Daleview Dr (tunnel to expose all the cast iron, Mar 19, 2026).
How do I get alerts for new permits at 8206 Daleview Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 8204 Daleview DrNov 2, 2026Tunnel under the foundation to replace the cast-iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. two access holes are required: one at the cleanout and one at the laundry · 26 m away
- 8202 Millway DrAug 12, 2025Tunnel under the foundation to replace the cast iron in bathroom kitchen and laundry with sch 40 pvc · 30 m away
- 8208 Daleview DrMar 19, 2026Tunnel to expose all the cast iron · 54 m away
- 8211 Daleview DrSep 6, 202460 trench to replace yard sewer line. 50 tunnel below the foundation to replace both bathrooms and main drain lines. 2 access holes - 1 right 1 back · 64 m away
- 8210 Daleview DrMar 18, 2025Replace drain lines by tunneling at (2) bathrooms (1) kitchen and (1) laundry · 75 m away
- 8301 Millway DrJul 1, 2026Replacement of complete existing central heat and air system with or without duct work **brian king: replacing like for like 3t vertical gas hvac system. no structural changes · 98 m away
- 3101 Charlwood DrJan 16, 2026Excavation of 25ft beneath the foundation to replace cast-iron from exterior clean out to hall bathroom includes laboratory tie-in & bathtub · 101 m away
- 8204 Sandalwood CvFeb 5, 2024Sewer yard line repair · 106 m away
- 8302 Daleview DrOct 14, 2026Replacement of an existing water heater 50 gallon electric water heater replacement · 115 m away
- 8303 Millway DrFeb 17, 2025Install approximately 60 of 1 water service from meter to home and up to 50ft of main sewer line replaced · 115 m away
- 8202 Sandalwood CvJul 2, 2024Replacement of 10ft of gas line · 116 m away
- 8210 Sandalwood CvNov 18, 2026Repair 4 drain - dig up 4 drain line and make repair on 4 pvc with husky bands and additional pvc · 118 m away