8202 Millway Dr
Austin, TX 78757
Drain-line replacement permitted at 8202 Millway Dr
A plumbing permit filed August 12, 2025, covers tunneling beneath the foundation to replace cast-iron pipes serving the bathroom, kitchen and laundry with Schedule 40 PVC. The City of Austin lists the permit, 2025-100148 PP, as final. A separate 2023 permit covered replacement of an existing water heater.
Summarized from City of Austin records · updated Aug 12, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Aug 12, 2025
- since Aug 12, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel under the foundation to replace the cast iron in bathroom kitchen and laundry with sch 40 pvc
- AppliedAug 7, 2025
- IssuedAug 12, 2025
- WorkAug '25 – Aug '25
- Final inspectionAug 21, 2025
Passed final inspection Aug 21, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsTunnel under the foundation to replace the cast iron in bathroom kitchen and laundry with sch 40 pvc
Tunnel under the foundation to replace the cast iron in bathroom kitchen and laundry with sch 40 pvc
City of Austin permitPlumbing PermitFinal- Record
- 2025-100148 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2023-087467 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8202 Millway Dr
What work is happening at 8202 Millway Dr in Austin?
A City of Austin plumbing permit covers tunneling under the foundation to replace cast-iron pipes in the bathroom, kitchen and laundry with Schedule 40 PVC. The permit was filed August 12, 2025.
Is a new building being constructed at 8202 Millway Dr?
The available permits describe plumbing work at the address, not construction of a new building. The 2025 permit covers replacement of drain pipes beneath the foundation.
What is permit 2025-100148 PP for?
Permit 2025-100148 PP is for tunneling beneath the foundation to replace cast-iron plumbing in the bathroom, kitchen and laundry with Schedule 40 PVC. It was filed August 12, 2025, and is listed as final.
When was plumbing work permitted at 8202 Millway Dr?
The latest listed permit was filed August 12, 2025, for drain-line replacement. An earlier permit, 2023-087467 PP, was filed July 17, 2023, to replace an existing water heater.
Was a restaurant permitted at 8202 Millway Dr?
The available City of Austin permit descriptions show plumbing work, including drain-line and water-heater replacement. They do not describe a restaurant project.
Also being built nearby
All of 78757- 8206 Daleview DrSep 23, 2025Replacement of complete existing central heat and air system with or without duct work change out · 30 m away
- 8208 Daleview DrMar 19, 2026Tunnel to expose all the cast iron · 46 m away
- 8204 Daleview DrNov 2, 2026Tunnel under the foundation to replace the cast-iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. two access holes are required: one at the cleanout and one at the laundry · 49 m away
- 8210 Daleview DrMar 18, 2025Replace drain lines by tunneling at (2) bathrooms (1) kitchen and (1) laundry · 65 m away
- 8301 Millway DrJul 1, 2026Replacement of complete existing central heat and air system with or without duct work **brian king: replacing like for like 3t vertical gas hvac system. no structural changes · 76 m away
- 8211 Daleview DrSep 6, 202460 trench to replace yard sewer line. 50 tunnel below the foundation to replace both bathrooms and main drain lines. 2 access holes - 1 right 1 back · 78 m away
- 8303 Millway DrFeb 17, 2025Install approximately 60 of 1 water service from meter to home and up to 50ft of main sewer line replaced · 93 m away
- 8302 Daleview DrOct 14, 2026Replacement of an existing water heater 50 gallon electric water heater replacement · 101 m away
- 8304 Daleview DrApr 12, 2024Whole sewer line yard replacement clean out is in the front left side of the house · 121 m away
- 3101 Charlwood DrJan 16, 2026Excavation of 25ft beneath the foundation to replace cast-iron from exterior clean out to hall bathroom includes laboratory tie-in & bathtub · 123 m away
- 8304 Millway DrApr 13, 2026Interior remodel · 124 m away
- 8204 Sandalwood CvFeb 5, 2024Sewer yard line repair · 135 m away
More restaurants in 78757.