8304 Daleview Dr
Austin, TX 78757
8304 Daleview Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 8304 Daleview Dr, Austin, TX 78757. The most recent, filed April 12, 2024, covers: “Whole sewer line yard replacement clean out is in the front left side of the house”.
Compiled from City of Austin records · updated Apr 12, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Apr 12, 2024
- since Apr 12, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledWhole sewer line yard replacement clean out is in the front left side of the house
- AppliedApr 11, 2024
- IssuedApr 12, 2024
- WorkApr '24 – May '24
- Final inspectionMay 3, 2024
Passed final inspection May 3, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsWhole sewer line yard replacement clean out is in the front left side of the house
Whole sewer line yard replacement clean out is in the front left side of the house
City of Austin permitPlumbing PermitFinal- Record
- 2024-045441 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
60 foot tunnel to repair and replace all cast-iron under the foundation
60 foot tunnel to repair and replace all cast-iron under the foundation
City of Austin permitPlumbing PermitFinal- Record
- 2023-076240 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8304 Daleview Dr
What is being built at 8304 Daleview Dr?
The latest filing (City of Austin permit 2024-045441 PP, April 12, 2024) covers whole sewer line yard replacement clean out is in the front left side of the house.
How many permits and filings does 8304 Daleview Dr have?
2 filings across 2 projects, from April 12, 2024 to April 12, 2024.
Is there other construction near 8304 Daleview Dr?
Yes. Nearby filings include 8302 Daleview Dr (replacement of an existing water heater 50 gallon electric water heater replacement, Oct 14, 2026); 8303 Millway Dr (install approximately 60 of 1 water service from meter to home and up to 50ft of main sewer line replaced, Feb 17, 2025); 8301 Millway Dr (replacement of complete existing central heat and air system with or without duct work **brian king: replacing like for like 3t vertical gas hvac system. no structural changes, Jul 1, 2026).
How do I get alerts for new permits at 8304 Daleview Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 8302 Daleview DrOct 14, 2026Replacement of an existing water heater 50 gallon electric water heater replacement · 20 m away
- 8303 Millway DrFeb 17, 2025Install approximately 60 of 1 water service from meter to home and up to 50ft of main sewer line replaced · 48 m away
- 8301 Millway DrJul 1, 2026Replacement of complete existing central heat and air system with or without duct work **brian king: replacing like for like 3t vertical gas hvac system. no structural changes · 54 m away
- 3106 Candlelight CtOct 3, 2024Express: painted walls new flooring new cabinets and countertops etc to update the house. replaced the old toilets with new ones. added decoration lights and changed some of the lights to new ones. replaced the windows with new ones. the inspector suggested a mechanical permit · 56 m away
- 8210 Daleview DrMar 18, 2025Replace drain lines by tunneling at (2) bathrooms (1) kitchen and (1) laundry · 59 m away
- 8208 Daleview DrMar 19, 2026Tunnel to expose all the cast iron · 81 m away
- 8304 Millway DrApr 13, 2026Interior remodel · 89 m away
- 3111 Stanwood DrJun 13, 2024Replacement of complete existing central heat and air system with or without duct work · 89 m away
- 3109 Stanwood DrSep 1, 2026Tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be two access holes: one in front and one on the side · 100 m away
- 3101 Candlelight CtOct 30, 2024Expedited review: addition to existing 1-story single family res [4bed 3bath]. work to include new 2-car garage with new 2nd story above garage · 104 m away
- 8310 Millway DrAug 2, 2026Replacement of complete existing central heat and air system with or without duct work replacement of 3-ton split hvac system with upflow furnace · 106 m away
- 8211 Daleview DrSep 6, 202460 trench to replace yard sewer line. 50 tunnel below the foundation to replace both bathrooms and main drain lines. 2 access holes - 1 right 1 back · 106 m away