3111 Stanwood Dr
Austin, TX 78757
3111 Stanwood Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 3111 Stanwood Dr, Austin, TX 78757. The most recent, filed June 13, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jun 13, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 13, 2024
- since Jun 13, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedMay 30, 2024
- IssuedJun 13, 2024
- WorkJun '24 – Mar '25
- Final inspectionMar 31, 2025
Passed final inspection Mar 31, 2025.
1 contact on this project
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-067929 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3111 Stanwood Dr
What is being built at 3111 Stanwood Dr?
The latest filing (City of Austin permit 2024-067929 MP, June 13, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 3111 Stanwood Dr have?
1 filing across 1 project, from June 13, 2024 to June 13, 2024.
Is there other construction near 3111 Stanwood Dr?
Yes. Nearby filings include 3109 Stanwood Dr (tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be two access holes: one in front and one on the side, Sep 1, 2026); 3106 Candlelight Ct (express: painted walls new flooring new cabinets and countertops etc to update the house. replaced the old toilets with new ones. added decoration lights and changed some of the lights to new ones. replaced the windows with new ones. the inspector suggested a mechanical permit, Oct 3, 2024); 8404 Daleview Dr (tunnel under the foundation and replace cast iron drain lines at (2) bathrooms kitchen and laundry. we are replacing it with pvc piping, Jul 1, 2024).
How do I get alerts for new permits at 3111 Stanwood Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 3109 Stanwood DrSep 1, 2026Tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be two access holes: one in front and one on the side · 26 m away
- 3106 Candlelight CtOct 3, 2024Express: painted walls new flooring new cabinets and countertops etc to update the house. replaced the old toilets with new ones. added decoration lights and changed some of the lights to new ones. replaced the windows with new ones. the inspector suggested a mechanical permit · 41 m away
- 8404 Daleview DrJul 1, 2024Tunnel under the foundation and replace cast iron drain lines at (2) bathrooms kitchen and laundry. we are replacing it with pvc piping · 58 m away
- 8304 Daleview DrApr 12, 2024Whole sewer line yard replacement clean out is in the front left side of the house · 89 m away
- 3101 Candlelight CtOct 30, 2024Expedited review: addition to existing 1-story single family res [4bed 3bath]. work to include new 2-car garage with new 2nd story above garage · 104 m away
- 8302 Daleview DrOct 14, 2026Replacement of an existing water heater 50 gallon electric water heater replacement · 108 m away
- 8501 Daleview DrJul 29, 2024Connect existing gas line to generator in yard · 127 m away
- 8310 Millway DrAug 2, 2026Replacement of complete existing central heat and air system with or without duct work replacement of 3-ton split hvac system with upflow furnace · 129 m away
- 8400 Franwood LnJun 6, 2025Storm damage repairs - repair overhead riser (new conductors and weatherhead) · 130 m away
- 8310 Franwood LnAug 13, 2026Update overhead riser install new meter can install new 125 amp outdoor main breaker update grounding · 131 m away
- 8303 Millway DrFeb 17, 2025Install approximately 60 of 1 water service from meter to home and up to 50ft of main sewer line replaced · 132 m away
- 8301 Millway DrJul 1, 2026Replacement of complete existing central heat and air system with or without duct work **brian king: replacing like for like 3t vertical gas hvac system. no structural changes · 142 m away