groundranger
Recent · latest filing Aug 2026Residential

8310 Millway Dr

Austin, TX 78757

Home HVAC and sewer-line work permitted at 8310 Millway Dr

Permits at 8310 Millway Dr cover replacement of the home's sewer line and central heating and air system, not a new building. The sewer-line plumbing permit was filed Sept. 5, 2024, and the HVAC mechanical permit was filed Aug. 2, 2026.

Summarized from City of Austin records · updated Aug 2, 2026

Projects
2
2 filings
Latest filing
Aug 2, 2026
since Sep 5, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work replacement of 3-ton split hvac system with upflow furnace

  1. AppliedJul 19, 2026
  2. IssuedAug 2, 2026
  3. WorkAug '26 – Aug '26
  4. Final inspectionAug 13, 2026

Passed final inspection Aug 13, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Replacement of complete existing central heat and air system with or without duct work replacement of 3-ton split hvac system with upflow furnace

    Replacement of complete existing central heat and air system with or without duct work replacement of 3-ton split hvac system with upflow furnace

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replace sewer line from house to city tap

    Replace sewer line from house to city tap

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 8310 Millway Dr

What is being built at 8310 Millway Dr?

The records show repairs and replacements at an existing home, not a new building. Work includes a sewer-line replacement and a central HVAC system replacement.

What work was permitted at 8310 Millway Dr?

Austin records list a plumbing permit to replace the sewer line from the house to the city tap, filed Sept. 5, 2024, and a mechanical permit for a 3-ton split HVAC system, filed Aug. 2, 2026.

When was the sewer-line permit filed at 8310 Millway Dr?

The plumbing permit, 2024-110828 PP, was filed Sept. 5, 2024. It covers replacing the sewer line from the house to the city tap.

Was a new HVAC system permitted at 8310 Millway Dr?

Yes. Mechanical permit 2026-092932 MP, filed Aug. 2, 2026, covers replacement of the existing central heat and air system with a 3-ton split HVAC system.

Are there plans for a new building at 8310 Millway Dr?

The two listed Austin permits are for sewer-line and HVAC work at an existing home. They do not indicate a new building.

What work is happening near Hardeman Family Joint Venture at 8406 Shoal Creek Blvd?

At 8310 Millway Dr, about 114 meters from that address, Austin records show sewer-line work filed in 2024 and HVAC replacement filed in 2026.

Also being built nearby

All of 78757
Email me when a new permit is filed