8303 Reeda Ln
Austin, TX 78757
8303 Reeda Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 8303 Reeda Ln, Austin, TX 78757. The most recent, filed July 22, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jul 22, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 22, 2024
- since Jul 22, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedJul 19, 2024
- IssuedJul 22, 2024
- WorkJul '24 – Jan '25
- Final inspectionSep 9, 2024
Passed final inspection Sep 9, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-089895 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8303 Reeda Ln
What is being built at 8303 Reeda Ln?
The latest filing (City of Austin permit 2024-089895 MP, July 22, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 8303 Reeda Ln have?
1 filing across 1 project, from July 22, 2024 to July 22, 2024.
Is there other construction near 8303 Reeda Ln?
Yes. Nearby filings include 8305 Reeda Ln (replacement of an existing water heater replace gas water heater, Nov 11, 2026); 8300 Reeda Ln (express - replace old windows with same size new windows in same location, Oct 20, 2025); 8308 Reeda Ln (install mini split system to shed under 200 sq ft, Dec 29, 2025).
How do I get alerts for new permits at 8303 Reeda Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 8305 Reeda LnNov 11, 2026Replacement of an existing water heater replace gas water heater · 16 m away
- 8300 Reeda LnOct 20, 2025Express - replace old windows with same size new windows in same location · 44 m away
- 8308 Reeda LnDec 29, 2025Install mini split system to shed under 200 sq ft · 64 m away
- 2001 Ohlen RdFeb 24, 2026Ir and garage conversion - complete interor renovation with removal and relocation of interior walls. exterior alterations to allow for the addition of new windows on the west (side) and south (rear) of the structure. garage door will be converted to window. front and back doors will be replaced. conversion of garage area to living storage and utility room. a full interior remodel is also proposed · 82 m away
- 8301 Weyburn DrSep 28, 2026New irrigation installation only in front yard · 86 m away
- 8312 Weyburn DrNov 11, 2024Excavate 14 tunnel to repair drain line serving washing machine & kitchen · 111 m away
- 1913 Ohlen RdNov 11, 2025Build new 200 amp service · 114 m away
- 2011 Doris DrSep 13, 2024Replacement of complete existing central heat and air system with or without duct work · 118 m away
- 2114 Lanier DrNov 10, 2026Replace rag riser and fde panel with new 200amp service · 125 m away
- 8316 Reeda LnOct 8, 2025Addition/remodel. addition of a 2nd floor to existing 1-story single family residence consisting of two bedrooms 1 bathroom and a utility room. demolish unpermitted converted carport with new attached carport at rear of residence. addition/remodel will result in a 3 bedroom 2.5 bathroom single family residence. comprehensive interior remodel. reconfigure interior layout. *meter is to be relocated to rack - reference 2026 147579 ep · 125 m away
- 1911 Ohlen RdFeb 25, 2026Tunnel under foundation to remove cast iron for 1 full bathroom and one half bathroom kitchen and washer drain. there will be 2 access holes will be made on the outside of the home one in the back where kitchen is located and the second where drain line exits the foundation. total length of tunnel is approximately 70 feet. sewer line will also be replaced from the home to the city tap connection total length of sewer line is approximately 80 feet · 130 m away
- 8302 Cochrane CvDec 7, 2023Gasline repipe · 131 m away