1911 Ohlen Rd
Austin, TX 78757
Plumbing and sewer-line work permitted at 1911 Ohlen Rd
A plumbing permit dated February 25, 2026, covers work at the home at 1911 Ohlen Rd in Austin. The work includes tunneling beneath the foundation to replace cast-iron drain lines serving one full bathroom, one half bathroom, the kitchen and washer, plus replacing the sewer line to the city tap.
Summarized from City of Austin records · updated Feb 25, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 25, 2026
- since Feb 25, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel under foundation to remove cast iron for 1 full bathroom and one half bathroom kitchen and washer drain. there will be 2 access holes will be made on the outside of the home one in the back where kitchen is located and the second where drain line exits the foundation. total length of tunnel is approximately 70 feet. sewer line will also be replaced from the home to the city tap connection total length of sewer line is approximately 80 feet
- AppliedFeb 19, 2026
- IssuedFeb 25, 2026
- WorkFeb '26 – Mar '26
- Final inspectionMar 4, 2026
Passed final inspection Mar 4, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel under foundation to remove cast iron for 1 full bathroom and one half bathroom kitchen and washer drain. there will be 2 access holes will be made on the outside of the home one in the back where kitchen is located and the second where drain line exits the foundation. total length of tunnel is approximately 70 feet. sewer line will also be replaced from the home to the city tap connection total length of sewer line is approximately 80 feet
Tunnel under foundation to remove cast iron for 1 full bathroom and one half bathroom kitchen and washer drain. there will be 2 access holes will be made on the outside of the home one in the back where kitchen is located and the second where drain line exits the foundation. total length of tunnel is approximately 70 feet. sewer line will also be replaced from the home to the city tap connection total length of sewer line is approximately 80 feet
City of Austin permitPlumbing PermitFinal- Record
- 2026-020220 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1911 Ohlen Rd
What is being built at 1911 Ohlen Rd in Austin?
The City of Austin permit describes plumbing and sewer-line replacement at a home, not a new building. Permit 2026-020220 PP is dated February 25, 2026.
What plumbing work is permitted at 1911 Ohlen Rd?
The permit covers tunneling beneath the foundation to replace cast-iron drain lines serving one full bathroom, one half bathroom, the kitchen and washer. It also covers replacing the sewer line from the home to the city tap.
How long is the tunnel planned at 1911 Ohlen Rd?
The permit description estimates the tunnel at about 70 feet. It also describes about 80 feet of sewer-line replacement from the home to the city tap.
When was the permit filed for 1911 Ohlen Rd?
The City of Austin record for plumbing permit 2026-020220 PP is dated February 25, 2026, and shows a final status.
Is a restaurant opening at 1911 Ohlen Rd?
The available City of Austin permit describes plumbing and sewer-line work at a home; it does not describe a restaurant opening.
How much will the work at 1911 Ohlen Rd cost?
The permit record does not list a reported valuation or project-cost estimate.
Also being built nearby
All of 78757- 1913 Ohlen RdNov 11, 2025Build new 200 amp service · 19 m away
- 2108 Lanier DrOct 15, 2025Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be (2-3) access holes on the right and left sides of the house · 45 m away
- 2114 Lanier DrNov 10, 2026Replace rag riser and fde panel with new 200amp service · 49 m away
- 8301 Weyburn DrSep 28, 2026New irrigation installation only in front yard · 59 m away
- 2001 Ohlen RdFeb 24, 2026Ir and garage conversion - complete interor renovation with removal and relocation of interior walls. exterior alterations to allow for the addition of new windows on the west (side) and south (rear) of the structure. garage door will be converted to window. front and back doors will be replaced. conversion of garage area to living storage and utility room. a full interior remodel is also proposed · 64 m away
- 8302 Cochrane CvDec 7, 2023Gasline repipe · 73 m away
- 2111 Lanier DrApr 15, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds in front back and the side of the house · 81 m away
- 8303 Cochrane CvOct 24, 2025Install a full lawn sprinkler system · 96 m away
- 2103 Lanier DrApr 12, 2024Interior remodel. rearrange kitchen changing floor materials converting one room to a walk in closet removing a load bearing wall in the kitchen closing door from kitchen to garage · 122 m away
- 8303 Reeda LnJul 22, 2024Replacement of complete existing central heat and air system with or without duct work · 130 m away
- 8305 Reeda LnNov 11, 2026Replacement of an existing water heater replace gas water heater · 135 m away
- 1822 Ohlen RdAug 22, 2024Request to disconnect austin energy left a pink slip for repairs to be done in 72 hours. we are 200 amp overhead service rebuild and update to all current code · 138 m away
More restaurants in 78757.