2103 Lanier Dr
Austin, TX 78757
2103 Lanier Dr: 3 projects on record
City of Austin lists 3 filings across 3 projects at 2103 Lanier Dr, Austin, TX 78757 since November 29, 2023. The most recent, filed April 12, 2024, covers: “Interior remodel. rearrange kitchen changing floor materials converting one room to a walk in closet removing a load bearing wall in the kitchen closing door from kitchen to garage”.
Compiled from City of Austin records · updated Apr 12, 2024
- Projects
- 3
- 3 filings
- Latest filing
- Apr 12, 2024
- since Nov 29, 2023
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsInterior remodel. rearrange kitchen changing floor materials converting one room to a walk in closet removing a load bearing wall in the kitchen closing door from kitchen to garage
Interior remodel. rearrange kitchen changing floor materials converting one room to a walk in closet removing a load bearing wall in the kitchen closing door from kitchen to garage
City of Austin permitElectrical PermitFinal- Record
- 2024-004664 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel. rearrange kitchen changing floor materials converting one room to a walk in closet removing a load bearing wall in the kitchen closing door from kitchen to garage
Interior remodel. rearrange kitchen changing floor materials converting one room to a walk in closet removing a load bearing wall in the kitchen closing door from kitchen to garage
City of Austin permitPlumbing PermitFinal- Record
- 2023-132206 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel. rearrange kitchen changing floor materials converting one room to a walk in closet removing a load bearing wall in the kitchen closing door from kitchen to garage
Interior remodel. rearrange kitchen changing floor materials converting one room to a walk in closet removing a load bearing wall in the kitchen closing door from kitchen to garage
City of Austin permitBuilding PermitFinal- Record
- 2023-132206 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2103 Lanier Dr
What is being built at 2103 Lanier Dr?
The latest filing (City of Austin permit 2024-004664 EP, April 12, 2024) covers interior remodel. rearrange kitchen changing floor materials converting one room to a walk in closet removing a load bearing wall in the kitchen closing door from kitchen to garage.
How many permits and filings does 2103 Lanier Dr have?
3 filings across 3 projects, from November 29, 2023 to April 12, 2024.
Is there other construction near 2103 Lanier Dr?
Yes. Nearby filings include 2102 Kenbridge Dr (75 tunnel below the foundation to replace entire cast-iron drain system. 2 access holes - one front one garage, Sep 24, 2024); 8205 Shadowood Dr (excavate 30 tunnel to repair main drain line under house, Feb 19, 2026); 2108 Lanier Dr (tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be (2-3) access holes on the right and left sides of the house, Oct 15, 2025).
How do I get alerts for new permits at 2103 Lanier Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 2102 Kenbridge DrSep 24, 202475 tunnel below the foundation to replace entire cast-iron drain system. 2 access holes - one front one garage · 53 m away
- 8205 Shadowood DrFeb 19, 2026Excavate 30 tunnel to repair main drain line under house · 66 m away
- 2108 Lanier DrOct 15, 2025Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be (2-3) access holes on the right and left sides of the house · 78 m away
- 2111 Lanier DrApr 15, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds in front back and the side of the house · 83 m away
- 1911 Ohlen RdFeb 25, 2026Tunnel under foundation to remove cast iron for 1 full bathroom and one half bathroom kitchen and washer drain. there will be 2 access holes will be made on the outside of the home one in the back where kitchen is located and the second where drain line exits the foundation. total length of tunnel is approximately 70 feet. sewer line will also be replaced from the home to the city tap connection total length of sewer line is approximately 80 feet · 122 m away
- 1823 Ohlen RdJul 31, 2025Express: roof covering replacement roof decking board repair replace existing turbine vents with ridge vents · 125 m away
- 2114 Lanier DrNov 10, 2026Replace rag riser and fde panel with new 200amp service · 129 m away
- 8105 Shadowood DrMay 7, 2024Express: foundation repair · 134 m away
- 1913 Ohlen RdNov 11, 2025Build new 200 amp service · 134 m away
- 2111 Kenbridge DrJun 26, 2024Conversion of existing attached 2-car garage to 1-car garage and office; kitchen interior remodel: expanding kitchen · 141 m away
- 1820 Richwood DrAug 26, 2024Replacement of complete existing central heat and air system with or without duct work · 141 m away
- 2104 Teakwood DrApr 9, 2024Interior remodel of existing sfr · 147 m away
More restaurants in 78757.