groundranger
Recent · latest filing Jul 2025Residential

1823 Ohlen Rd

Austin, TX 78757

Home bathroom, plumbing and roof work at 1823 Ohlen Rd

City of Austin permits indicate remodeling work at this home, including two bathrooms, plumbing and electrical updates. The building permit was filed December 8, 2023, with plumbing and electrical permits filed December 13. Separate permits filed in May and July 2025 cover roof replacement and repairs.

Summarized from City of Austin records · updated Jul 31, 2025

Projects
5
5 filings
Latest filing
Jul 31, 2025
since Dec 8, 2023
Largest scope
—
Listed value
—

Where this project stands

Finaled

Express: roof covering replacement roof decking board repair replace existing turbine vents with ridge vents

  1. AppliedMay 27, 2025
  2. IssuedJul 31, 2025
  3. WorkJul '25 – Aug '25
  4. Final inspectionAug 6, 2025

Passed final inspection Aug 6, 2025.

1 contact on this project · 1 phone number

Permit & project history

5 projects
  1. Express: roof covering replacement roof decking board repair replace existing turbine vents with ridge vents

    Express: roof covering replacement roof decking board repair replace existing turbine vents with ridge vents

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Express: roof covering replacement roof decking board repair replace existing turbine vents with ridge vents

    Express: roof covering replacement roof decking board repair replace existing turbine vents with ridge vents

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Remodel both bathrooms move & replace wall dividing bathrooms replace all cast iron plumbing under slab with pvc trench and place pvc drainpipe around the house to existing pvc pipe that connects to city sewer move/replace some lights outlets & switches

    Remodel both bathrooms move & replace wall dividing bathrooms replace all cast iron plumbing under slab with pvc trench and place pvc drainpipe around the house to existing pvc pipe that connects to city sewer move/replace some lights outlets & switches

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Remodel both bathrooms move & replace wall dividing bathrooms replace all cast iron plumbing under slab with pvc trench and place pvc drainpipe around the house to existing pvc pipe that connects to city sewer move/replace some lights outlets & switches

    Remodel both bathrooms move & replace wall dividing bathrooms replace all cast iron plumbing under slab with pvc trench and place pvc drainpipe around the house to existing pvc pipe that connects to city sewer move/replace some lights outlets & switches

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Remodel both bathrooms move & replace wall dividing bathrooms replace all cast iron plumbing under slab with pvc trench and place pvc drainpipe around the house to existing pvc pipe that connects to city sewer move/replace some lights outlets & switches

    Remodel both bathrooms move & replace wall dividing bathrooms replace all cast iron plumbing under slab with pvc trench and place pvc drainpipe around the house to existing pvc pipe that connects to city sewer move/replace some lights outlets & switches

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1823 Ohlen Rd

What is being built at 1823 Ohlen Rd?

The permits describe remodeling and repair work at a home, not a new building. Work includes two bathroom remodels, plumbing and electrical updates, and roof replacement.

When was the bathroom remodeling permitted at 1823 Ohlen Rd?

The building permit, 2023-153739 BP, was filed December 8, 2023. Plumbing and electrical permits for the work were filed December 13, 2023, and all three are listed as final.

What plumbing work is planned at 1823 Ohlen Rd?

The permit description calls for replacing cast-iron plumbing under the slab with PVC, routing a PVC drainpipe around the house to the existing sewer connection, and remodeling both bathrooms. Plumbing permit 2023-153739 PP was filed December 13, 2023, and is listed as final.

Is the roof being replaced at 1823 Ohlen Rd?

Yes. A building permit filed May 28, 2025, describes roof-covering replacement and roof-decking board repairs. It also mentions replacing existing turbine vents with ridge vents.

What do the 2025 permits say about work at 1823 Ohlen Rd?

Building permit 2025-065398 BP was filed May 28, 2025, and mechanical permit 2025-065398 MP was filed July 31, 2025. Both describe roof-covering replacement, decking repairs and replacing turbine vents with ridge vents; both are listed as final.

Also being built nearby

All of 78757
Email me when a new permit is filed