8212 Renton Dr
Austin, TX 78757
8212 Renton Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 8212 Renton Dr, Austin, TX 78757 since August 29, 2024. The most recent, filed April 1, 2025, covers: “Install evse”.
Compiled from City of Austin records · updated Apr 1, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Apr 1, 2025
- since Aug 29, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall evse
- AppliedMar 29, 2025
- IssuedApr 1, 2025
- WorkApr '25 – Apr '25
- Final inspectionApr 3, 2025
Passed final inspection Apr 3, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall evse
Install evse
City of Austin permitElectrical PermitFinal- Record
- 2025-037718 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Emergency service repair
Emergency service repair
City of Austin permitElectrical PermitFinal- Record
- 2024-107542 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8212 Renton Dr
What is being built at 8212 Renton Dr?
The latest filing (City of Austin permit 2025-037718 EP, April 1, 2025) covers install evse.
How many permits and filings does 8212 Renton Dr have?
2 filings across 2 projects, from August 29, 2024 to April 1, 2025.
Is there other construction near 8212 Renton Dr?
Yes. Nearby filings include 8210 Renton Dr (tunnel under the foundation to replace the cast-iron drain lines. there will be two access holes: one in front and one on the side, Sep 27, 2026); 8216 Renton Dr (replacement of complete existing central heat and air system with or without duct work, May 17, 2024); 8213 Renton Dr (replacement of complete existing central heat and air system with or without duct work, Jun 29, 2025).
How do I get alerts for new permits at 8212 Renton Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 8210 Renton DrSep 27, 2026Tunnel under the foundation to replace the cast-iron drain lines. there will be two access holes: one in front and one on the side · 19 m away
- 8216 Renton DrMay 17, 2024Replacement of complete existing central heat and air system with or without duct work · 38 m away
- 8213 Renton DrJun 29, 2025Replacement of complete existing central heat and air system with or without duct work · 42 m away
- 1804 Kendra CvJul 1, 2026Interior remodel including kitchen and bathroom updates replacement of fixtures finishes flooring and cabinetry interior reconfiguration in the living room area including modification of a load bearing wall. no change to building footprint or exterior walls · 75 m away
- 1807 Kendra CvJul 30, 2024*change of use* interior remodel of existing 1-story single family residence to create a duplex residential use. add a kitchen and full bathroom within existing bedroom to create an additional dwelling unit. 1st (existing) dwelling will consist of a living room kitchen dining room 4 bedrooms 2.5 bathrooms storage room and mudroom. 2nd (new) dwelling unit will consist of a living room kitchen 1 bedroom and 1 bathroom. roll in scope of work of expired mp#: 2020-093354 · 102 m away
- 1823 Ohlen RdJul 31, 2025Express: roof covering replacement roof decking board repair replace existing turbine vents with ridge vents · 105 m away
- 1818 Richwood DrJul 8, 2026We will be removing all the cast iron under the house and replacing with pvc · 115 m away
- 8403 Kimble CvJul 30, 2025Repair 50 feet of sewer yard line · 116 m away
- 1820 Richwood DrAug 26, 2024Replacement of complete existing central heat and air system with or without duct work · 118 m away
- 1801 Kendra CvMay 8, 2026Diagnostic revealed reoccurring sewer stoppages underneath foundation. sewer system underneath foundation is original cast iron sewer piping and needs to be replaced. this is a complete sewer repipe. sewer line in the yard is pvc and in good working condition. - plan of action is to apply for a permit with the customers jurisdiction to legally and professionally proceed with repairs. - begin by excavating an entry hole on the left side of the home where the sewer line exits the foundation. - then rite way will tunnel underneath the foundation and expose all cast iron piping underneath the foundation home owner will be paying rite way directly and plumbing outfitters will not be subbing out the tunneling. - if additional tunneling or beam penetration is needed a supplemented estimate will be provided. - if any more work is needed such as solid rock removal roots or any unforeseeable objects come across this estimate will be supplemented to accommodate the additional work needed to complete the job · 128 m away
- 8205 Shadowood DrFeb 19, 2026Excavate 30 tunnel to repair main drain line under house · 131 m away
- 1803 Kendra CvJan 17, 2025Replacement of complete existing central heat and air system with or without duct work · 131 m away