8210 Renton Dr
Austin, TX 78757
Under-foundation drain-line replacement at 8210 Renton Dr
A tunnel beneath the foundation will provide access to replace cast-iron drain lines at 8210 Renton Dr. The City of Austin issued plumbing permit 2026-123633 PP on September 27, 2026; the permit is marked final. The work description specifies one access hole in front and one on the side.
Summarized from City of Austin records · updated Sep 27, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 27, 2026
- since Sep 27, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel under the foundation to replace the cast-iron drain lines. there will be two access holes: one in front and one on the side
- AppliedSep 21, 2026
- IssuedSep 27, 2026
- WorkSep '26 – Oct '26
- Final inspectionOct 8, 2026
Passed final inspection Oct 8, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel under the foundation to replace the cast-iron drain lines. there will be two access holes: one in front and one on the side
Tunnel under the foundation to replace the cast-iron drain lines. there will be two access holes: one in front and one on the side
City of Austin permitPlumbing PermitFinal- Record
- 2026-123633 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8210 Renton Dr
What work is permitted at 8210 Renton Dr?
The permit covers tunneling beneath the foundation to replace cast-iron drain lines. It specifies two access holes, one in front and one on the side.
When was the plumbing work at 8210 Renton Dr permitted?
The City of Austin permit was filed September 27, 2026. Permit number: 2026-123633 PP.
What is permit 2026-123633 PP for?
It is for a tunnel under the foundation to replace cast-iron drain lines at 8210 Renton Dr. The City of Austin lists it as a plumbing permit with final status.
Are there plans to build a new home at 8210 Renton Dr?
The available permit describes plumbing work beneath the foundation, not construction of a new home.
How many access holes are planned for the work at 8210 Renton Dr?
The permit description calls for two access holes: one in front and one on the side.
Also being built nearby
All of 78757- 8212 Renton DrApr 1, 2025Install evse · 19 m away
- 8213 Renton DrJun 29, 2025Replacement of complete existing central heat and air system with or without duct work · 44 m away
- 8216 Renton DrMay 17, 2024Replacement of complete existing central heat and air system with or without duct work · 57 m away
- 1804 Kendra CvJul 1, 2026Interior remodel including kitchen and bathroom updates replacement of fixtures finishes flooring and cabinetry interior reconfiguration in the living room area including modification of a load bearing wall. no change to building footprint or exterior walls · 60 m away
- 1807 Kendra CvJul 30, 2024*change of use* interior remodel of existing 1-story single family residence to create a duplex residential use. add a kitchen and full bathroom within existing bedroom to create an additional dwelling unit. 1st (existing) dwelling will consist of a living room kitchen dining room 4 bedrooms 2.5 bathrooms storage room and mudroom. 2nd (new) dwelling unit will consist of a living room kitchen 1 bedroom and 1 bathroom. roll in scope of work of expired mp#: 2020-093354 · 83 m away
- 1818 Richwood DrJul 8, 2026We will be removing all the cast iron under the house and replacing with pvc · 102 m away
- 1820 Richwood DrAug 26, 2024Replacement of complete existing central heat and air system with or without duct work · 108 m away
- 1801 Kendra CvMay 8, 2026Diagnostic revealed reoccurring sewer stoppages underneath foundation. sewer system underneath foundation is original cast iron sewer piping and needs to be replaced. this is a complete sewer repipe. sewer line in the yard is pvc and in good working condition. - plan of action is to apply for a permit with the customers jurisdiction to legally and professionally proceed with repairs. - begin by excavating an entry hole on the left side of the home where the sewer line exits the foundation. - then rite way will tunnel underneath the foundation and expose all cast iron piping underneath the foundation home owner will be paying rite way directly and plumbing outfitters will not be subbing out the tunneling. - if additional tunneling or beam penetration is needed a supplemented estimate will be provided. - if any more work is needed such as solid rock removal roots or any unforeseeable objects come across this estimate will be supplemented to accommodate the additional work needed to complete the job · 111 m away
- 1803 Kendra CvJan 17, 2025Replacement of complete existing central heat and air system with or without duct work · 113 m away
- 8403 Kimble CvJul 30, 2025Repair 50 feet of sewer yard line · 119 m away
- 1823 Ohlen RdJul 31, 2025Express: roof covering replacement roof decking board repair replace existing turbine vents with ridge vents · 121 m away
- 8205 Shadowood DrFeb 19, 2026Excavate 30 tunnel to repair main drain line under house · 132 m away