8213 Renton Dr
Austin, TX 78757
8213 Renton Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 8213 Renton Dr, Austin, TX 78757. The most recent, filed June 29, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jun 29, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 29, 2025
- since Jun 29, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedJun 16, 2025
- IssuedJun 29, 2025
- WorkJun '25 – Oct '25
- Final inspectionOct 30, 2025
Passed final inspection Oct 30, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-075027 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8213 Renton Dr
What is being built at 8213 Renton Dr?
The latest filing (City of Austin permit 2025-075027 MP, June 29, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 8213 Renton Dr have?
1 filing across 1 project, from June 29, 2025 to June 29, 2025.
Is there other construction near 8213 Renton Dr?
Yes. Nearby filings include 8212 Renton Dr (install evse, Apr 1, 2025); 8210 Renton Dr (tunnel under the foundation to replace the cast-iron drain lines. there will be two access holes: one in front and one on the side, Sep 27, 2026); 1804 Kendra Cv (interior remodel including kitchen and bathroom updates replacement of fixtures finishes flooring and cabinetry interior reconfiguration in the living room area including modification of a load bearing wall. no change to building footprint or exterior walls, Jul 1, 2026).
How do I get alerts for new permits at 8213 Renton Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 8212 Renton DrApr 1, 2025Install evse · 42 m away
- 8210 Renton DrSep 27, 2026Tunnel under the foundation to replace the cast-iron drain lines. there will be two access holes: one in front and one on the side · 44 m away
- 1804 Kendra CvJul 1, 2026Interior remodel including kitchen and bathroom updates replacement of fixtures finishes flooring and cabinetry interior reconfiguration in the living room area including modification of a load bearing wall. no change to building footprint or exterior walls · 61 m away
- 8216 Renton DrMay 17, 2024Replacement of complete existing central heat and air system with or without duct work · 64 m away
- 8403 Kimble CvJul 30, 2025Repair 50 feet of sewer yard line · 75 m away
- 8405 Kimble CvOct 20, 2026Replacement of an existing water heater replace existing tankless water heater with new tankless · 97 m away
- 1807 Kendra CvJul 30, 2024*change of use* interior remodel of existing 1-story single family residence to create a duplex residential use. add a kitchen and full bathroom within existing bedroom to create an additional dwelling unit. 1st (existing) dwelling will consist of a living room kitchen dining room 4 bedrooms 2.5 bathrooms storage room and mudroom. 2nd (new) dwelling unit will consist of a living room kitchen 1 bedroom and 1 bathroom. roll in scope of work of expired mp#: 2020-093354 · 107 m away
- 8407 Kimble CvMar 24, 2025We will be tunneling underneath the house to repair plumbing pipes below the slab **we will start the tunnel on the right hand side of the house. well be digging 6 feet(deep) by 3 feet (wide) · 110 m away
- 1801 Kendra CvMay 8, 2026Diagnostic revealed reoccurring sewer stoppages underneath foundation. sewer system underneath foundation is original cast iron sewer piping and needs to be replaced. this is a complete sewer repipe. sewer line in the yard is pvc and in good working condition. - plan of action is to apply for a permit with the customers jurisdiction to legally and professionally proceed with repairs. - begin by excavating an entry hole on the left side of the home where the sewer line exits the foundation. - then rite way will tunnel underneath the foundation and expose all cast iron piping underneath the foundation home owner will be paying rite way directly and plumbing outfitters will not be subbing out the tunneling. - if additional tunneling or beam penetration is needed a supplemented estimate will be provided. - if any more work is needed such as solid rock removal roots or any unforeseeable objects come across this estimate will be supplemented to accommodate the additional work needed to complete the job · 114 m away
- 1803 Kendra CvJan 17, 2025Replacement of complete existing central heat and air system with or without duct work · 123 m away
- 1811 Ohlen RdJan 12, 2024Emergency upgraded overhead service taken down by a tree · 129 m away
- 8409 Kimble CvApr 18, 2025Upgrade electrical service · 129 m away