8612 Millway Dr
Austin, TX 78757
Water heater replacement permitted at 8612 Millway Dr
A permit at 8612 Millway Dr covers replacement of an existing water heater. Austin issued the plumbing permit on November 7, 2025 (2025-142048 PP); an earlier building permit for foundation repair was filed on November 1, 2023 (2023-141389 BP).
Summarized from City of Austin records · updated Nov 7, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Nov 7, 2025
- since Nov 7, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedNov 4, 2025
- IssuedNov 7, 2025
- WorkNov '25 – Nov '25
- Final inspectionNov 24, 2025
Passed final inspection Nov 24, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2025-142048 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: foundation repair
Express: foundation repair
City of Austin permitBuilding PermitFinal- Record
- 2023-141389 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8612 Millway Dr
What is being built at 8612 Millway Dr?
The listed permits do not describe new construction. The latest permit covers replacement of an existing water heater.
What work was permitted at 8612 Millway Dr?
Austin's November 7, 2025 plumbing permit, 2025-142048 PP, covers replacement of an existing water heater.
When was the water heater replacement permitted?
The City of Austin issued the plumbing permit on November 7, 2025. The permit number is 2025-142048 PP.
Was foundation repair permitted at 8612 Millway Dr?
Yes. An Austin building permit for express foundation repair was filed on November 1, 2023, under permit number 2023-141389 BP.
Is a new home being built at 8612 Millway Dr?
The listed records do not show a new home being built. They describe water heater replacement and earlier foundation repair.
What work is happening near Austin Optometry Group?
A permit at 8612 Millway Dr, about 114 meters from Austin Optometry Group at 8701 Shoal Creek Boulevard, covers replacement of an existing water heater. It was issued on November 7, 2025.
Also being built nearby
All of 78757- 8601 Dawnridge CirFeb 12, 2025Ev install · 39 m away
- 8700 Millway DrJun 19, 2025Replacement of complete existing central heat and air system with or without duct work · 46 m away
- 3206 Benbrook DrDec 23, 2025Replacement of complete existing central heat and air system related to ongoing interior remodel. installation of kitchen vent hood · 59 m away
- 8603 Dawnridge CirJun 30, 2025Replacement of complete existing central heat and air system with or without duct work · 60 m away
- 8701 Millway DrMar 5, 2026Enclosing pre-existing concrete slab to function as 10x7 seating area adjoining main bathroom. adding two 4 can lights to the interior and two optional led light switches <50w total power draw. removing pre-existing sliding doors. enclosure attached to home via extension of existing roof & screen door opening. no changes made to walls / stone exterior of home · 69 m away
- 8604 Millway DrFeb 12, 2026Express: tub to shower conversion in the primary bath with new backing and tile. new tile and backing in the guest shower. size for size windows throughout the house except for the garage window and dining room. new front door size for size. cosmetic update throughout home · 85 m away
- 8701 Shoal Creek BlvdAug 21, 2026Qt - 14 window replacements no new openings. existing office space. units d301 d302 and d304. building d interchangeable with building 3 · 90 m away
- 3205 Benbrook DrSep 21, 2026Replacement of complete existing central heat and air system with or without duct work · 109 m away
- 8701 Shoal Creek Boulevard · Austin Optometry GroupMay 14, 2025Wolf — renovation/alteration — tenant finish-out · 114 m away
- 8701 Dawnridge CirSep 11, 202612x25 pool with autofill ng heater and astm f1346 automatic safety cover · 118 m away
- 3200 Benbrook DrNov 12, 2026Replace all cast iron drain lines in the slab with pvc. this will be done by tunneling from the homeowner cleanout on the left side of the house to the master bathroom. there will be 3 access holes made to get under the house. there is a possibly that the drain line from the house to the street will have to be lowered because of the re-pipe. the new drain lines will be hung from the under side of the slab on metal hangers. the tunnel will be approx. 100 · 118 m away
- 8600 Millway DrNov 14, 2025Tunnel up to 60 to expose and replace all easily accessible cast iron sewer pipe under home. we will also be trenching up to 50 to expose and replace main building sewer line. tunnel access will be located at the front right side of home near existing homeowner cleanouts · 130 m away