8601 Dawnridge Cir
Austin, TX 78757
8601 Dawnridge Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 8601 Dawnridge Cir, Austin, TX 78757. The most recent, filed February 12, 2025, covers: “Ev install”.
Compiled from City of Austin records · updated Feb 12, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 12, 2025
- since Feb 12, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEv install
- AppliedJan 29, 2025
- IssuedFeb 12, 2025
- WorkFeb '25 – Aug '25
- Final inspectionFeb 13, 2025
Passed final inspection Feb 13, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectEv install
Ev install
City of Austin permitElectrical PermitFinal- Record
- 2025-011661 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8601 Dawnridge Cir
What is being built at 8601 Dawnridge Cir?
The latest filing (City of Austin permit 2025-011661 EP, February 12, 2025) covers ev install.
How many permits and filings does 8601 Dawnridge Cir have?
1 filing across 1 project, from February 12, 2025 to February 12, 2025.
Is there other construction near 8601 Dawnridge Cir?
Yes. Nearby filings include 8603 Dawnridge Cir (replacement of complete existing central heat and air system with or without duct work, Jun 30, 2025); 8612 Millway Dr (replacement of an existing water heater, Nov 7, 2025); 3206 Benbrook Dr (replacement of complete existing central heat and air system related to ongoing interior remodel. installation of kitchen vent hood, Dec 23, 2025).
How do I get alerts for new permits at 8601 Dawnridge Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 8603 Dawnridge CirJun 30, 2025Replacement of complete existing central heat and air system with or without duct work · 20 m away
- 8612 Millway DrNov 7, 2025Replacement of an existing water heater · 39 m away
- 3206 Benbrook DrDec 23, 2025Replacement of complete existing central heat and air system related to ongoing interior remodel. installation of kitchen vent hood · 42 m away
- 8701 Millway DrMar 5, 2026Enclosing pre-existing concrete slab to function as 10x7 seating area adjoining main bathroom. adding two 4 can lights to the interior and two optional led light switches <50w total power draw. removing pre-existing sliding doors. enclosure attached to home via extension of existing roof & screen door opening. no changes made to walls / stone exterior of home · 51 m away
- 8700 Millway DrJun 19, 2025Replacement of complete existing central heat and air system with or without duct work · 62 m away
- 8701 Dawnridge CirSep 11, 202612x25 pool with autofill ng heater and astm f1346 automatic safety cover · 81 m away
- 3200 Benbrook DrNov 12, 2026Replace all cast iron drain lines in the slab with pvc. this will be done by tunneling from the homeowner cleanout on the left side of the house to the master bathroom. there will be 3 access holes made to get under the house. there is a possibly that the drain line from the house to the street will have to be lowered because of the re-pipe. the new drain lines will be hung from the under side of the slab on metal hangers. the tunnel will be approx. 100 · 86 m away
- 3205 Benbrook DrSep 21, 2026Replacement of complete existing central heat and air system with or without duct work · 94 m away
- 8604 Millway DrFeb 12, 2026Express: tub to shower conversion in the primary bath with new backing and tile. new tile and backing in the guest shower. size for size windows throughout the house except for the garage window and dining room. new front door size for size. cosmetic update throughout home · 96 m away
- 8701 Shoal Creek BlvdAug 21, 2026Qt - 14 window replacements no new openings. existing office space. units d301 d302 and d304. building d interchangeable with building 3 · 126 m away
- 3206 Crosscreek DrDec 6, 2024Replacement of complete existing central heat and air system with or without duct work · 130 m away
- 3204 Crosscreek DrSep 16, 202570 tunnel below the foundation to replace entire drain system. 2 access holes - back right 40 trench thru yard to replace yard sewer · 135 m away