3204 Crosscreek Dr
Austin, TX 78757
3204 Crosscreek Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 3204 Crosscreek Dr, Austin, TX 78757. The most recent, filed September 16, 2025, covers: “70 tunnel below the foundation to replace entire drain system. 2 access holes - back right 40 trench thru yard to replace yard sewer”.
Compiled from City of Austin records · updated Sep 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 16, 2025
- since Sep 16, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled70 tunnel below the foundation to replace entire drain system. 2 access holes - back right 40 trench thru yard to replace yard sewer
- AppliedAug 25, 2025
- IssuedSep 16, 2025
- WorkSep '25 – Oct '25
- Final inspectionOct 10, 2025
Passed final inspection Oct 10, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 project70 tunnel below the foundation to replace entire drain system. 2 access holes - back right 40 trench thru yard to replace yard sewer
70 tunnel below the foundation to replace entire drain system. 2 access holes - back right 40 trench thru yard to replace yard sewer
City of Austin permitPlumbing PermitFinal- Record
- 2025-107579 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3204 Crosscreek Dr
What is being built at 3204 Crosscreek Dr?
The latest filing (City of Austin permit 2025-107579 PP, September 16, 2025) covers 70 tunnel below the foundation to replace entire drain system. 2 access holes - back right 40 trench thru yard to replace yard sewer.
How many permits and filings does 3204 Crosscreek Dr have?
1 filing across 1 project, from September 16, 2025 to September 16, 2025.
Is there other construction near 3204 Crosscreek Dr?
Yes. Nearby filings include 3206 Crosscreek Dr (replacement of complete existing central heat and air system with or without duct work, Dec 6, 2024); 3200 Crosscreek Dr (replacement of complete existing central heat and air system with or without duct work hvac replacement, Jul 10, 2026); 3205 Benbrook Dr (replacement of complete existing central heat and air system with or without duct work, Sep 21, 2026).
How do I get alerts for new permits at 3204 Crosscreek Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 3206 Crosscreek DrDec 6, 2024Replacement of complete existing central heat and air system with or without duct work · 19 m away
- 3200 Crosscreek DrJul 10, 2026Replacement of complete existing central heat and air system with or without duct work hvac replacement · 39 m away
- 3205 Benbrook DrSep 21, 2026Replacement of complete existing central heat and air system with or without duct work · 43 m away
- 8600 Millway DrNov 14, 2025Tunnel up to 60 to expose and replace all easily accessible cast iron sewer pipe under home. we will also be trenching up to 50 to expose and replace main building sewer line. tunnel access will be located at the front right side of home near existing homeowner cleanouts · 57 m away
- 8604 Millway DrFeb 12, 2026Express: tub to shower conversion in the primary bath with new backing and tile. new tile and backing in the guest shower. size for size windows throughout the house except for the garage window and dining room. new front door size for size. cosmetic update throughout home · 77 m away
- 3200 Benbrook DrNov 12, 2026Replace all cast iron drain lines in the slab with pvc. this will be done by tunneling from the homeowner cleanout on the left side of the house to the master bathroom. there will be 3 access holes made to get under the house. there is a possibly that the drain line from the house to the street will have to be lowered because of the re-pipe. the new drain lines will be hung from the under side of the slab on metal hangers. the tunnel will be approx. 100 · 92 m away
- 3206 Benbrook DrDec 23, 2025Replacement of complete existing central heat and air system related to ongoing interior remodel. installation of kitchen vent hood · 93 m away
- 8504 Millway DrMay 14, 2025Replacement of complete existing central heat and air system with or without duct work · 120 m away
- 8603 Dawnridge CirJun 30, 2025Replacement of complete existing central heat and air system with or without duct work · 132 m away
- 8601 Dawnridge CirFeb 12, 2025Ev install · 135 m away
- 8502 Daleview DrAug 12, 2025Replacement of complete existing central heat and air system with or without duct work · 139 m away
- 8612 Millway DrNov 7, 2025Replacement of an existing water heater · 144 m away