3206 Crosscreek Dr
Austin, TX 78757
3206 Crosscreek Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 3206 Crosscreek Dr, Austin, TX 78757. The most recent, filed December 6, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Dec 6, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 6, 2024
- since Dec 6, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedNov 27, 2024
- IssuedDec 6, 2024
- WorkDec '24 – Jan '25
- Final inspectionJan 16, 2025
Passed final inspection Jan 16, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-156948 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3206 Crosscreek Dr
What is being built at 3206 Crosscreek Dr?
The latest filing (City of Austin permit 2024-156948 MP, December 6, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 3206 Crosscreek Dr have?
1 filing across 1 project, from December 6, 2024 to December 6, 2024.
Is there other construction near 3206 Crosscreek Dr?
Yes. Nearby filings include 3204 Crosscreek Dr (70 tunnel below the foundation to replace entire drain system. 2 access holes - back right 40 trench thru yard to replace yard sewer, Sep 16, 2025); 8600 Millway Dr (tunnel up to 60 to expose and replace all easily accessible cast iron sewer pipe under home. we will also be trenching up to 50 to expose and replace main building sewer line. tunnel access will be located at the front right side of home near existing homeowner cleanouts, Nov 14, 2025); 3205 Benbrook Dr (replacement of complete existing central heat and air system with or without duct work, Sep 21, 2026).
How do I get alerts for new permits at 3206 Crosscreek Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 3204 Crosscreek DrSep 16, 202570 tunnel below the foundation to replace entire drain system. 2 access holes - back right 40 trench thru yard to replace yard sewer · 19 m away
- 8600 Millway DrNov 14, 2025Tunnel up to 60 to expose and replace all easily accessible cast iron sewer pipe under home. we will also be trenching up to 50 to expose and replace main building sewer line. tunnel access will be located at the front right side of home near existing homeowner cleanouts · 38 m away
- 3205 Benbrook DrSep 21, 2026Replacement of complete existing central heat and air system with or without duct work · 45 m away
- 3200 Crosscreek DrJul 10, 2026Replacement of complete existing central heat and air system with or without duct work hvac replacement · 58 m away
- 8604 Millway DrFeb 12, 2026Express: tub to shower conversion in the primary bath with new backing and tile. new tile and backing in the guest shower. size for size windows throughout the house except for the garage window and dining room. new front door size for size. cosmetic update throughout home · 60 m away
- 3206 Benbrook DrDec 23, 2025Replacement of complete existing central heat and air system related to ongoing interior remodel. installation of kitchen vent hood · 89 m away
- 3200 Benbrook DrNov 12, 2026Replace all cast iron drain lines in the slab with pvc. this will be done by tunneling from the homeowner cleanout on the left side of the house to the master bathroom. there will be 3 access holes made to get under the house. there is a possibly that the drain line from the house to the street will have to be lowered because of the re-pipe. the new drain lines will be hung from the under side of the slab on metal hangers. the tunnel will be approx. 100 · 101 m away
- 8504 Millway DrMay 14, 2025Replacement of complete existing central heat and air system with or without duct work · 114 m away
- 8603 Dawnridge CirJun 30, 2025Replacement of complete existing central heat and air system with or without duct work · 130 m away
- 8601 Dawnridge CirFeb 12, 2025Ev install · 130 m away
- 8612 Millway DrNov 7, 2025Replacement of an existing water heater · 134 m away
- 8515 Shoal Creek BlvdSep 15, 2026Retroactive permit application for the emergency replacement of two (2) existing 100-gallon commercial water heaters serving the apartment building. at the time of the original service call the existing water heaters were actively leaking and the building had been without hot water for approximately seven business days. due to the active leaks and lack of domestic hot water to the building the condition was classified as an emergency and replacement work proceeded immediately. magic plumbing atx sourced and replaced both existing 100-gallon water heaters and replaced/repaired associated damaged piping and components within the mechanical room as required to complete the installation and restore hot water service. during the work extremely heavy scale/mineral buildup was observed on the hot-water side of the existing system and piping. this application is being submitted retroactively to permit and inspect the completed emergency water-heater replacement work · 146 m away