8504 Millway Dr
Austin, TX 78757
8504 Millway Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 8504 Millway Dr, Austin, TX 78757. The most recent, filed May 14, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated May 14, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 14, 2025
- since May 14, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedMay 12, 2025
- IssuedMay 14, 2025
- WorkMay '25 – Oct '25
- Final inspectionOct 13, 2025
Passed final inspection Oct 13, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-058815 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8504 Millway Dr
What is being built at 8504 Millway Dr?
The latest filing (City of Austin permit 2025-058815 MP, May 14, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 8504 Millway Dr have?
1 filing across 1 project, from May 14, 2025 to May 14, 2025.
What is being built near Expocare in Austin?
8504 Millway Dr is about 152 m from Expocare (8500 Shoal Creek Blvd). Its latest filing is for replacement of complete existing central heat and air system with or without duct work.
Is there other construction near 8504 Millway Dr?
Yes. Nearby filings include 8500 Millway Dr (life safety- unable to use bathrooms due to broken cast iron will need to redo pvc under slab, Apr 27, 2026); 8515 Shoal Creek Blvd (retroactive permit application for the emergency replacement of two (2) existing 100-gallon commercial water heaters serving the apartment building. at the time of the original service call the existing water heaters were actively leaking and the building had been without hot water for approximately seven business days. due to the active leaks and lack of domestic hot water to the building the condition was classified as an emergency and replacement work proceeded immediately. magic plumbing atx sourced and replaced both existing 100-gallon water heaters and replaced/repaired associated damaged piping and components within the mechanical room as required to complete the installation and restore hot water service. during the work extremely heavy scale/mineral buildup was observed on the hot-water side of the existing system and piping. this application is being submitted retroactively to permit and inspect the completed emergency water-heater replacement work, Sep 15, 2026); 8501 Millway Dr (gas gauge test, Aug 28, 2025).
How do I get alerts for new permits at 8504 Millway Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 8500 Millway DrApr 27, 2026Life safety- unable to use bathrooms due to broken cast iron will need to redo pvc under slab · 43 m away
- 8515 Shoal Creek BlvdSep 15, 2026Retroactive permit application for the emergency replacement of two (2) existing 100-gallon commercial water heaters serving the apartment building. at the time of the original service call the existing water heaters were actively leaking and the building had been without hot water for approximately seven business days. due to the active leaks and lack of domestic hot water to the building the condition was classified as an emergency and replacement work proceeded immediately. magic plumbing atx sourced and replaced both existing 100-gallon water heaters and replaced/repaired associated damaged piping and components within the mechanical room as required to complete the installation and restore hot water service. during the work extremely heavy scale/mineral buildup was observed on the hot-water side of the existing system and piping. this application is being submitted retroactively to permit and inspect the completed emergency water-heater replacement work · 70 m away
- 8501 Millway DrAug 28, 2025Gas gauge test · 71 m away
- 8502 Daleview DrAug 12, 2025Replacement of complete existing central heat and air system with or without duct work · 94 m away
- 8600 Millway DrNov 14, 2025Tunnel up to 60 to expose and replace all easily accessible cast iron sewer pipe under home. we will also be trenching up to 50 to expose and replace main building sewer line. tunnel access will be located at the front right side of home near existing homeowner cleanouts · 103 m away
- 3206 Crosscreek DrDec 6, 2024Replacement of complete existing central heat and air system with or without duct work · 114 m away
- 3204 Crosscreek DrSep 16, 202570 tunnel below the foundation to replace entire drain system. 2 access holes - back right 40 trench thru yard to replace yard sewer · 120 m away
- 3200 Crosscreek DrJul 10, 2026Replacement of complete existing central heat and air system with or without duct work hvac replacement · 141 m away
- 8604 Millway DrFeb 12, 2026Express: tub to shower conversion in the primary bath with new backing and tile. new tile and backing in the guest shower. size for size windows throughout the house except for the garage window and dining room. new front door size for size. cosmetic update throughout home · 148 m away
- 8501 Daleview DrJul 29, 2024Connect existing gas line to generator in yard · 150 m away
- 8500 Shoal Creek BlvdDec 17, 2025Repair gas line on roof to restore gas service · 152 m away
- 8404 Millway DrAug 6, 2026Tunnel under home approximately 45 ft to make repairs to multiple breaks in the sewer line · 153 m away