907 Taulbee Ln
Austin, TX 78757
Emergency electrical panel replacement at 907 Taulbee Ln
An emergency repair at 907 Taulbee Ln will replace the main electrical panel because its main phase and neutral connections could not be repaired without replacing the panel. The City of Austin permit was filed December 10, 2025, and is marked final.
Summarized from City of Austin records · updated Dec 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 10, 2025
- since Dec 10, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEmergency repair. replace main electrical panel. main phase and neutral connections can not be repaired without replacing panel
- AppliedDec 10, 2025
- IssuedDec 10, 2025
- WorkDec '25 – May '26
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectEmergency repair. replace main electrical panel. main phase and neutral connections can not be repaired without replacing panel
Emergency repair. replace main electrical panel. main phase and neutral connections can not be repaired without replacing panel
City of Austin permitElectrical PermitFinal- Record
- 2025-156576 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 907 Taulbee Ln
What is being done at 907 Taulbee Ln in Austin?
A City of Austin electrical permit describes an emergency repair to replace the main electrical panel. It says the main phase and neutral connections could not be repaired without replacing the panel.
When was the electrical work permitted at 907 Taulbee Ln?
The permit was filed on December 10, 2025. Its status is listed as final.
What is the permit number for 907 Taulbee Ln?
The City of Austin permit number is 2025-156576 EP. It was filed December 10, 2025.
Is a new home being built at 907 Taulbee Ln?
The available permit describes an emergency electrical panel replacement, not construction of a new home.
What does the permit say about the electrical panel at 907 Taulbee Ln?
It says the main phase and neutral connections could not be repaired without replacing the panel. The permit is an electrical permit dated December 10, 2025.
Also being built nearby
All of 78757- 909 Taulbee LnMar 2, 2007North gate addition, resub of lot 21, block b — north gate addition, resub of lot 21, block b · 24 m away
- 911 Taulbee LnNov 7, 2025Replacement of complete existing central heat and air system with or without duct work · 29 m away
- 904 Taulbee LnJan 27, 2017Resubdivision of lot 25, block c, northgate addition · 52 m away
- 913 Taulbee LnDec 20, 2023Replacement of an existing water heater · 53 m away
- 1001 Taulbee LnDec 17, 2024Replacing sewer line from home to city tap · 87 m away
- 906 Morrow StJun 12, 2026Amnesty co for non complying single-family residence circa 1946 · 94 m away
- 904 Morrow StSep 22, 2026904 morrow townhomes · 94 m away
- 910 Morrow StSep 8, 2025Cap of for water and wastewater total demolition of sfr 706 sq ft circa 1948 · 97 m away
- 912 Morrow StSep 2, 2026Replacement of complete existing central heat and air system with or without duct work · 106 m away
- 826 Morrow StSep 17, 2025New two story sq ft condo residence - 3 bedrooms 2.5 baths covered porch and attached 1 car garage · 109 m away
- 1000 Taulbee LnJan 6, 2015Lot 38 north gate half acres: resubdivision of · 111 m away
- 1007 Taulbee LnJan 2, 2025Installation of a lvl 2 electrical vehicle charger · 135 m away