912 Morrow St
Austin, TX 78757
912 Morrow St permit covers central HVAC replacement
A City of Austin permit covers replacement of the existing central heat and air system at 912 Morrow St, with or without duct work. The mechanical permit was filed September 2, 2026, and is listed as final.
Summarized from City of Austin records · updated Sep 2, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 2, 2026
- since Sep 2, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedAug 25, 2026
- IssuedSep 2, 2026
- WorkSep '26 – Nov '26
- Final inspectionNov 10, 2026
Passed final inspection Nov 10, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2026-111012 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 912 Morrow St
What is happening at 912 Morrow St in Austin?
A City of Austin mechanical permit covers replacement of the existing central heat and air system, with or without duct work. It was filed September 2, 2026.
Is a new building being built at 912 Morrow St?
The available permit describes HVAC replacement, not construction of a new building.
What does permit 2026-111012 MP cover?
Permit 2026-111012 MP covers replacement of the existing central heat and air system, with or without duct work. The City of Austin record lists it as a mechanical permit.
When was the HVAC permit filed for 912 Morrow St?
The permit was filed September 2, 2026, and is listed as final.
Does the permit include duct work at 912 Morrow St?
The permit description says the central heat and air system replacement may be with or without duct work; it does not specify which.
Also being built nearby
All of 78757- 910 Morrow StSep 8, 2025Cap of for water and wastewater total demolition of sfr 706 sq ft circa 1948 · 20 m away
- 906 Morrow StJun 12, 2026Amnesty co for non complying single-family residence circa 1946 · 53 m away
- 913 Morrow StAug 19, 2024Replacement of complete existing central heat and air system with or without duct work · 54 m away
- 1004 Morrow StNov 3, 2025(chalikonda sri) - installation of circuit for elec. vehicle charging station - esip · 66 m away
- 904 Morrow StSep 22, 2026904 morrow townhomes · 70 m away
- 905 Morrow StJan 3, 2024Installation of 2 ev charging receptacles · 82 m away
- 1007 Taulbee LnJan 2, 2025Installation of a lvl 2 electrical vehicle charger · 90 m away
- 913 Taulbee LnDec 20, 2023Replacement of an existing water heater · 94 m away
- 909 Taulbee LnMar 2, 2007North gate addition, resub of lot 21, block b — north gate addition, resub of lot 21, block b · 95 m away
- 1001 Taulbee LnDec 17, 2024Replacing sewer line from home to city tap · 95 m away
- 823 Morrow StOct 1, 2024Upgrade main electric service to 200 amps install evse · 106 m away
- 907 Taulbee LnDec 10, 2025Emergency repair. replace main electrical panel. main phase and neutral connections can not be repaired without replacing panel · 106 m away