1000 Alden Dr
Austin, TX 78758
Sewer and drain system replacement at 1000 Alden Dr
A plumbing permit filed on October 21, 2025, covers replacement of the yard sewer and the entire drain system at 1000 Alden Dr. The scope describes a 65-foot tunnel below the foundation and three access holes; the permit is marked Final.
Summarized from City of Austin records · updated Oct 21, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 21, 2025
- since Oct 21, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled35 trench to replace yard sewer and 65 tunnel below the foundation to replace entire drain system. 3 access holes- left left back
- AppliedOct 3, 2025
- IssuedOct 21, 2025
- WorkOct '25 – Jan '26
- Final inspectionJan 12, 2026
Passed final inspection Jan 12, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 project35 trench to replace yard sewer and 65 tunnel below the foundation to replace entire drain system. 3 access holes- left left back
35 trench to replace yard sewer and 65 tunnel below the foundation to replace entire drain system. 3 access holes- left left back
City of Austin permitPlumbing PermitFinal- Record
- 2025-126409 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1000 Alden Dr
What is being built at 1000 Alden Dr in Austin?
A City of Austin plumbing permit covers sewer and drain system replacement, not a new building. The scope includes replacing the yard sewer and the entire drain system.
What work is planned at 1000 Alden Dr?
Permit 2025-126409 PP describes trenching to replace the yard sewer and a 65-foot tunnel below the foundation to replace the drain system. It also lists three access holes.
When was the plumbing permit for 1000 Alden Dr filed?
The City of Austin permit was filed on October 21, 2025. Its status is Final.
What is permit 2025-126409 PP for?
The plumbing permit is for replacing the yard sewer and entire drain system at 1000 Alden Dr. The scope includes a tunnel below the foundation.
Is a new home being built at 1000 Alden Dr?
The record does not describe new home construction. It lists plumbing work to replace the yard sewer and drain system.
Also being built nearby
All of 78758- 1002 Alden DrMay 28, 2025Tunneling under home up to 89 linear feet replacing all piping found within tunnel · 23 m away
- 1001 Chesapeake DrSep 18, 2026Exterior electrical service upgrade: install a new 200-amp meter box. install a 200-amp main disconnect. install new service drop cables. install a new 2-inch rigid conduit for the service drop. install grounding rods · 41 m away
- 1004 Alden DrSep 11, 2024Emergency repair. neutral conductor failed at weather head. must rebuild main service. 125 amp. 120/240 volt single phase · 43 m away
- 8521 Jamestown DrOct 22, 2026200amp service replacement. ae is the electrical provider · 48 m away
- 1008 Chesapeake DrApr 17, 2024Replacement of complete existing central heat and air system with or without duct work · 102 m away
- 1009 Alden DrOct 12, 2026Replacement of complete existing central heat and air system with or without duct work · 116 m away
- 8511 Jamestown DrSep 20, 2026Tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. two access holes will be required: one in front and one on the side · 120 m away
- 1100 Alden DrDec 13, 2024Express: replace 3 windows like for like · 129 m away
- 1012 Chesapeake DrAug 19, 2025Excavate 62 tunnel to repair main drain line under house serving whole house · 133 m away
- 1001 Plymouth DrDec 2, 2025Replacement of complete existing central heat and air system with or without duct work · 140 m away
- 1103 Alden DrApr 10, 2026Replacement of complete existing central heat and air system with or without duct work · 154 m away
- 1104 Alden DrNov 21, 2025Replacement of an existing water heater · 172 m away