Existing central heating and air system replacement permitted
A complete replacement of the existing central heating and air system is covered by a City of Austin mechanical permit at 1001 Plymouth Dr. The permit was filed on December 2, 2025, and its status is final.
Summarized from City of Austin records · updated Dec 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 2, 2025
- since Dec 2, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedNov 26, 2025
- IssuedDec 2, 2025
- WorkDec '25 – Dec '25
- Final inspectionDec 8, 2025
Passed final inspection Dec 8, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-152052 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1001 Plymouth Dr
What is being built at 1001 Plymouth Dr?
A City of Austin mechanical permit covers replacement of the existing central heating and air system, with or without ductwork. It does not describe a new building.
Is a new home being built at 1001 Plymouth Dr?
The permit record is for replacing the existing central heat and air system, not for building a new home.
When was the permit filed for 1001 Plymouth Dr?
The City of Austin permit was filed on December 2, 2025.
What work does the permit at 1001 Plymouth Dr cover?
It covers replacement of the complete existing central heat and air system, with or without ductwork.
What is the permit number for the work at 1001 Plymouth Dr?
The permit number is 2025-152052 MP. The City of Austin lists its status as final.
Also being built nearby
All of 78758- 1000 Colony North DrNov 13, 202428 feet sewer line in the yard replacement · 44 m away
- 8511 Jamestown DrSep 20, 2026Tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. two access holes will be required: one in front and one on the side · 52 m away
- 8505 Jamestown DrFeb 19, 2025Express: repair drywall framing and flooring from car hit · 54 m away
- 1009 Plymouth DrJun 25, 2024Express: replace windows like for like revision: tub to shower conversion · 79 m away
- 1004 Colony North DrOct 20, 2025Create approximately 80 linear feet of tunnel under the home to access and replace existing sewer lines. excavate a 36 linear foot trench beginning at the right-side corner of the front porch and extending toward the street. trench dimensions will be approximately 4 feet deep by 2 feet wide. due to the proximity of a tree the trench will curve around it maintaining a 10-foot clearance to preserve root systems · 81 m away
- 1009 Alden DrOct 12, 2026Replacement of complete existing central heat and air system with or without duct work · 95 m away
- 1103 Alden DrApr 10, 2026Replacement of complete existing central heat and air system with or without duct work · 119 m away
- 8439 Jamestown DrSep 15, 2026Replacement of yard sewer in front yard · 124 m away
- 1004 Alden DrSep 11, 2024Emergency repair. neutral conductor failed at weather head. must rebuild main service. 125 amp. 120/240 volt single phase · 124 m away
- 1100 Colony North DrApr 29, 202593 tunnel below the foundation to replace entire cast iron drain system. 3 access holes - front/back/left · 126 m away
- 1002 Alden DrMay 28, 2025Tunneling under home up to 89 linear feet replacing all piping found within tunnel · 130 m away
- 1000 Alden DrOct 21, 202535 trench to replace yard sewer and 65 tunnel below the foundation to replace entire drain system. 3 access holes- left left back · 140 m away