groundranger
Historic · latest filing May 2025Commercial

11400 Domain Dr

Austin, TX 78758

Two-port EV charger replacement at 11400 Domain Dr

A pedestal-mounted EV charger with two ports is being replaced at 11400 Domain Dr. City of Austin building and electrical permits were filed on May 8, 2025, and both are marked final.

Summarized from City of Austin records · updated May 8, 2025

Projects
2
2 filings
Latest filing
May 8, 2025
since May 8, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

1 xeal single port dual port configuration pedestal mounted ev charger 2 ports total. 1 xeal single port dual port configuration pedestal mounted ev charger to be rip and replaced. 2 ports total. 1 40a circuit breaker

  1. AppliedApr 24, 2025
  2. IssuedMay 8, 2025
  3. WorkMay '25 – May '25
  4. Final inspectionMay 15, 2025

Passed final inspection May 15, 2025.

2 contacts on this project · 2 phone numbers

Permit & project history

2 projects
  1. 1 xeal single port dual port configuration pedestal mounted ev charger 2 ports total. 1 xeal single port dual port configuration pedestal mounted ev charger to be rip and replaced. 2 ports total. 1 40a circuit breaker

    1 xeal single port dual port configuration pedestal mounted ev charger 2 ports total. 1 xeal single port dual port configuration pedestal mounted ev charger to be rip and replaced. 2 ports total. 1 40a circuit breaker

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. 1 xeal single port dual port configuration pedestal mounted ev charger 2 ports total. 1 xeal single port dual port configuration pedestal mounted ev charger to be rip and replaced. 2 ports total. 1 40a circuit breaker

    1 xeal single port dual port configuration pedestal mounted ev charger 2 ports total. 1 xeal single port dual port configuration pedestal mounted ev charger to be rip and replaced. 2 ports total. 1 40a circuit breaker

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 11400 Domain Dr

What is being installed at 11400 Domain Dr in Austin?

A two-port, pedestal-mounted EV charger is being replaced, according to City of Austin permits filed May 8, 2025.

When was the EV charger work permitted?

The building permit, 2025-052315 BP, and electrical permit, 2025-052315 EP, were both filed May 8, 2025. Both are marked final.

How many charging ports are included at 11400 Domain Dr?

The permit descriptions specify two ports total for the replacement EV charger.

Is a new building being constructed at 11400 Domain Dr?

The permits describe replacing an existing EV charger, not constructing a new building.

What's being installed near Moxies-Domain on Esperanza Xing?

At 11400 Domain Dr, about 145 meters from Moxies-Domain, City of Austin permits describe replacement of a two-port EV charger. The permits were filed May 8, 2025.

Also being built nearby

All of 78758
Email me when a new permit is filed