2222 W Rundberg Lane
Austin, TX 78758 · Enovis 3d, Enovis Vhp Room
Renovations for Enovis manufacturing space
TDLR registrations indicate renovations to manufacturing space inside a multi-tenant facility at 2222 W Rundberg Lane, including a controlled manufacturing area and a sterilization room. The sterilization-room project was registered on January 5, 2024, and the controlled manufacturing-space project on May 29, 2025. The 2025 project lists an applicant-estimated cost of $1,123,662.
Summarized from Texas Department of Licensing and Regulation records · updated May 29, 2025
- Projects
- 2
- 2 filings
- Latest filing
- May 29, 2025
- since Jan 5, 2024
- Largest scope
- 3,462 sf
- Estimated cost
- $1.1M
- state registration
Where this project stands
CompletedEnovis 3D
2,028 sq ft · $1.1M est.
- RegisteredMay 29, 2025
- Plan review
- ConstructionJul '25 – Sep '25
- Inspected
- Closed
Ran as a 3-month build.
4 contacts on this project · 4 phone numbers
Permit & project history
2 projectsProvide specifically controlled manufacturing space inside existing facility. — metric 3
TDLR project registrationRenovation/AlterationProject Closed2,028 sq ft$1.1M est.- Project #
- TABS2025019993
- Tenant / owner
- Enovis 3d
- Design firm
- Pro
- Contact
- Pro
Renovation of an existing 1-story manufacturing facility to include a sterilization room. (3,462 sq ft) — enovis
TDLR project registrationRenovation/AlterationProject Closed3,462 sq ft$350K est.- Project #
- TABS2024008651
- Tenant / owner
- Enovis Vhp Room
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2222 W Rundberg Lane
What is being built at 2222 W Rundberg Lane?
TDLR registrations describe renovations inside an existing multi-tenant facility, including a sterilization room and specifically controlled manufacturing space for Enovis projects.
Is 2222 W Rundberg Lane a new building?
The registrations describe renovations to an existing one-story manufacturing facility, not construction of a new building.
When were the projects at 2222 W Rundberg Lane registered?
The sterilization-room renovation was registered January 5, 2024. A controlled manufacturing-space renovation was registered May 29, 2025.
How much is the Enovis manufacturing renovation estimated to cost?
The 2025 TDLR registration lists an applicant-estimated cost of $1,123,662 for the controlled manufacturing-space project.
What's being renovated near Met 4/12 on Rundberg Lane?
At 2222 W Rundberg Lane, TDLR registrations describe Enovis-related renovations for a sterilization room and controlled manufacturing space inside a multi-tenant facility. Met 4/12 is about 241 meters away.
Is a sterilization room being added at 2222 W Rundberg Lane?
A TDLR registration dated January 5, 2024, describes renovation of an existing manufacturing facility to include a sterilization room. The registration lists 3,462 square feet.
Also being built nearby
All of 78758- 2106 Rundberg LnMar 2, 2007Metric center 4/12 · 40 m away
- 2107-1/2 Rundberg LnJan 10, 2014West rundberg lane extension · 103 m away
- 9500 Metric BlvdApr 18, 2024Remove/replace existing lighting fixtures with the new led fixtures · 111 m away
- 2222 W Rundberg LnJul 17, 2025Interior remodel to existing suite · 166 m away
- 9400 Metric BlvdJan 21, 2022Metric industrial · 177 m away
- 9800 Metric Blvd · Met 4/12 LtdAug 30, 2024Install new exit landing/stairs 60 sq ft and interior remodel to an existing light manufacturing building · 241 m away
- 9310 Metric BlvdSep 18, 2026Upgrade existing electrical service to new 600a 120/208v 3 phase 4-wire ct-metered service. replace existing exterior service equipment with new 600a non-fused service disconnect gutter / wireway ct cabinet / service section and 600a ct meter socket · 244 m away
- 2311-1/2 Rundberg LnNov 3, 2026Tco-west rundberg lane extension · 283 m away
- 2019-1/2 Rundberg LnJan 9, 2014North central elementary school no. 2 rundberg lane improvements · 297 m away
- 9801 Metric BlvdOct 15, 2025Adding (1) 400a breaker and disconnect (1) 60a breaker and disconnect and conduit and wire to feed · 343 m away
- 9701 Metric Blvd · Met 10b-96 LtdMay 20, 2024Eplan: expedited review - [approved] interior remodel and change of use to an existing office warehouse to lt. manufacturing (14290 sq ft) · 345 m away
- 9315 Mc Neil RdApr 28, 2026Construction of (1) new enclosed building addition (prefabricated metal building); (2) installation of a new emergency diesel back-up generator; (3) short extension of existing embedded train track from existing rmf bay #2. pupr2 · 347 m away