LED lighting replacement at 9500 Metric Blvd
Austin permits indicate existing lighting fixtures at 9500 Metric Blvd are being removed and replaced with LED fixtures. The building permit was filed December 21, 2023, and the electrical permit was filed April 18, 2024; both are marked final.
Summarized from City of Austin records · updated Apr 18, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Apr 18, 2024
- since Dec 21, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRemove/replace existing lighting fixtures with the new led fixtures
- AppliedDec 18, 2023
- IssuedApr 18, 2024
- WorkApr '24 – Apr '24
- Final inspectionApr 22, 2024
Passed final inspection Apr 22, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsRemove/replace existing lighting fixtures with the new led fixtures
Remove/replace existing lighting fixtures with the new led fixtures
City of Austin permitElectrical PermitFinal- Record
- 2023-161918 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Remove/replace existing lighting fixtures with the new led fixtures
Remove/replace existing lighting fixtures with the new led fixtures
City of Austin permitBuilding PermitFinal- Record
- 2023-161918 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9500 Metric Blvd
What is being built at 9500 Metric Blvd?
The listed Austin permits describe replacement of existing lighting fixtures with LED fixtures, not a new building. The building and electrical permits are marked final.
What work was permitted at 9500 Metric Blvd in Austin?
Permits 2023-161918 BP and 2023-161918 EP cover removing and replacing existing lighting fixtures with new LED fixtures.
When were the permits for 9500 Metric Blvd filed?
The building permit, 2023-161918 BP, was filed December 21, 2023. The electrical permit, 2023-161918 EP, was filed April 18, 2024.
Is a new building going up at 9500 Metric Blvd?
The listed permits describe lighting replacement at an existing site; they do not indicate new building construction.
What work is happening near Metric 3 on West Rundberg Lane?
Austin permit records list LED lighting replacement at 9500 Metric Blvd, about 111 meters from Metric 3 at 2222 W Rundberg Lane.
Also being built nearby
All of 78758- 2106 Rundberg LnMar 2, 2007Metric center 4/12 · 81 m away
- 2222 W Rundberg Lane · Metric 3May 29, 2025Enovis 3d — renovation/alteration — provide specifically controlled manufacturing space inside existing facility · 111 m away
- 2107-1/2 Rundberg LnJan 10, 2014West rundberg lane extension · 165 m away
- 9800 Metric Blvd · Met 4/12 LtdAug 30, 2024Install new exit landing/stairs 60 sq ft and interior remodel to an existing light manufacturing building · 198 m away
- 9701 Metric Blvd · Met 10b-96 LtdMay 20, 2024Eplan: expedited review - [approved] interior remodel and change of use to an existing office warehouse to lt. manufacturing (14290 sq ft) · 234 m away
- 2222 W Rundberg LnJul 17, 2025Interior remodel to existing suite · 237 m away
- 9801 Metric BlvdOct 15, 2025Adding (1) 400a breaker and disconnect (1) 60a breaker and disconnect and conduit and wire to feed · 246 m away
- 9400 Metric BlvdJan 21, 2022Metric industrial · 247 m away
- 2019-1/2 Rundberg LnJan 9, 2014North central elementary school no. 2 rundberg lane improvements · 312 m away
- 10000 Metric Blvd · Met 9w-98 LtdOct 13, 2026Tenant interior renovation of an existing dialysis clinic. work includes updating finishes plumbing mechanical electrical and the addition of a wall to the reception area · 319 m away
- 9310 Metric BlvdSep 18, 2026Upgrade existing electrical service to new 600a 120/208v 3 phase 4-wire ct-metered service. replace existing exterior service equipment with new 600a non-fused service disconnect gutter / wireway ct cabinet / service section and 600a ct meter socket · 322 m away
- 2018 W Rundberg LnMar 31, 2026Called out to customer spoke with diane. building 11 unit c replacement of complete existing central heat and air system with or without duct work install replacement of 1.5 ton ac system and rebuilding the supply plenum · 327 m away