3409 Esperanza Crossing
Austin, TX 78758 · Zara Stockroom, Zara Store + 2 more
Zara stockroom fit-out registered at The Domain
A 4,193-square-foot Zara stockroom fit-out is planned within a multi-tenant retail center at 3409 Esperanza Crossing. The project was registered with TDLR on March 25, 2026, under project number TABS2026015870. A separate registration dated March 17, 2025, covers a remodel and expansion of the existing Zara store.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 25, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Mar 25, 2026
- since May 14, 2024
- Largest scope
- 34,482 sf
- Estimated cost
- $5.0M
- state registration
Where this project stands
Finishing up · inspection nextZARA Stockroom
4,193 sq ft · $550K est.
- RegisteredMar 25, 2026
- Plan review
- ConstructionMar '26 – Jun '26
- Inspectednow
- Closed
Scheduled to finish Jun 11, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
4 projectsFit-out works for zara remote stockroom space in the domain. approximate 4193 sq ft, — the domain
TDLR project registrationRenovation/AlterationReview Complete4,193 sq ft$550K est.- Project #
- TABS2026015870
- Tenant / owner
- Zara Stockroom
- Design firm
- Pro
- Contact
- Pro
Remodel of existing zara store and the new expansion space in the domain. — the domain
TDLR project registrationRenovation/AlterationProject Closed34,482 sq ft$5.0M est.- Project #
- TABS2025014387
- Tenant / owner
- Zara Store
- Design firm
- Pro
- Contact
- Pro
Complete demolition of existing tenant space to deliver cold dark shell and new utility connection points — austin domain
TDLR project registrationRenovation/AlterationProject Closed22,686 sq ft$775K est.- Project #
- TABS2024020023
- Tenant / owner
- Landlord Work Redemised Shell Space P01a
- Design firm
- Pro
- Contact
- Pro
Reconfiguration of existing tenant space into redemised cold dark shell including new demising wall and utility connection points — austin domain
TDLR project registrationRenovation/AlterationProject Closed9,005 sq ft$405K est.- Project #
- TABS2024018522
- Tenant / owner
- Landlord Work Space P05c Re-Demise
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3409 Esperanza Crossing
What is being built at 3409 Esperanza Crossing?
TDLR records describe a fit-out for a Zara stockroom of approximately 4,193 square feet within the multi-tenant Domain retail center. The registration was filed March 25, 2026.
Is Zara opening a new store at 3409 Esperanza Crossing?
The latest registration is for a stockroom fit-out, not a new store. A separate TDLR registration from March 17, 2025, describes remodeling the existing Zara store and adding expansion space.
When was the Zara stockroom project registered?
The TDLR registration is dated March 25, 2026. Its project number is TABS2026015870.
What work is planned near Moxies at The Domain?
A Zara stockroom fit-out is registered at 3409 Esperanza Crossing, about 115 meters from Moxies at 3309 Esperanza Xing. The TDLR filing describes approximately 4,193 square feet of work.
Was Zara's existing store at The Domain also remodeled?
A separate TDLR registration dated March 17, 2025, describes a remodel of the existing Zara store and new expansion space. The filing lists 34,482 square feet and project number TABS2025014387.
Also being built nearby
All of 78758- 3409 Esperanza Crossing-Ste. 114 · Simon Property GroupJun 19, 2024Urban outfitters — renovation/alteration — tenant build out
- 3409 Esperanza XingJul 15, 2025Eplan: commercial expedited review - [concurrent] interior remodel of an exciting zara store 11796 sq ft and interior expansion to take over the forever 21 retail space 23251 sq ft suite #110 at the domain center to become a total of 35047 sq ft · 38 m away
- 11410 Century Oaks TerOct 16, 2026Construction of a two level storage facility in building c at the domain shopping center including a 582 sq ft ground level and 3959 sq ft upper level installation of an elevator and new finishes mep systems electrical and equipment. 2026-057872 da · 80 m away
- 11410 Century Oaks Terrace · The Domain Mall II LLCJun 18, 2026Johnnie-o — renovation/alteration — interior retail space construction sq ft 2100 · 93 m away
- 11410 Century Oaks Terrace Space A05 · Domain Mall II LLC TheMar 27, 2025Golden goose - the domain — renovation/alteration — interior tenant remodel. no change in use · 93 m away
- 11410 Century Oaks Terrace Space · The Domain Mall Ii, LLCMay 22, 2026Aritzia, the domain expansion — renovation/alteration — 1,155 sq ft retail tenant expansion of 7,013 sq ft existing retail space · 93 m away
- 3401 Esperanza XingNov 6, 20261/2 rpz for soda rack replacement · 102 m away
- 3311 Esperanza CrossingDec 19, 2024Macy's the domain — renovation/alteration — new construction of a starbucks cafe in an existing macy's department store. work includes demolition, new wall construction, casework, furniture, interior finishes, equipment and lighting · 104 m away
- 11401 Century Oaks Terrace · The Domain Mall II LLCJul 1, 2026Offices at the domain - suite 430/420 — renovation/alteration — renovation of an existing suite to be split into two separate suites · 109 m away
- 11401 Century Oaks TerOct 5, 2026Interior remodel of existing office space. (2 apps - suite 420 and 430) · 110 m away
- 3309 Esperanza Xing · Domain Mall II LLC TheAug 17, 2026Change of use office to restaurant. adding gi with remodel to existing tenant space · 115 m away
- 3309 Esperanza Crossing · Domain Mall, LLCFeb 14, 2024Hawkers - domain — renovation/alteration — tenant build out of an existing 7,281sf space/ proposed 2nd floor with bar and seating · 115 m away