8803 Redfield Ln
Austin, TX 78758
Sewer-line replacement permitted at 8803 Redfield Ln
A City of Austin plumbing permit covers sewer-line replacement at 8803 Redfield Ln, including a tunnel under the home and sewer-line work in the front yard. The permit was filed October 10, 2025, and is marked final.
Summarized from City of Austin records · updated Oct 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 10, 2025
- since Oct 10, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled1.tunnel under home to replace sewer line 50 2.sewer line in the yard which will be approx 48 front yard
- AppliedOct 7, 2025
- IssuedOct 10, 2025
- WorkOct '25 – Nov '25
- Final inspectionNov 6, 2025
Passed final inspection Nov 6, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 project1.tunnel under home to replace sewer line 50 2.sewer line in the yard which will be approx 48 front yard
1.tunnel under home to replace sewer line 50 2.sewer line in the yard which will be approx 48 front yard
City of Austin permitPlumbing PermitFinal- Record
- 2025-129581 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8803 Redfield Ln
What work is happening at 8803 Redfield Ln?
A plumbing permit covers a tunnel under the home to replace a sewer line and additional sewer-line work in the front yard.
When was the sewer-line permit filed?
The City of Austin filed permit 2025-129581 PP on October 10, 2025.
Is the permit for 8803 Redfield Ln final?
Yes. City of Austin permit 2025-129581 PP is marked final.
How long is the sewer work at 8803 Redfield Ln?
The permit description lists a tunnel under the home of about 50 feet and sewer-line work in the yard of about 48 feet.
Is a new home being built at 8803 Redfield Ln?
The available record is for a plumbing permit to replace a sewer line, not a new-home construction permit.
Also being built nearby
All of 78758- 8801 Redfield LnOct 10, 2024New irrigation system to backyard only · 19 m away
- 8807 Redfield LnDec 15, 2023Replace existing subpanel · 42 m away
- 8706 Brookfield DrAug 5, 2026Installation of 6.16kw solar pv system · 85 m away
- 8803 Brookfield DrSep 21, 2024Upgrade an existing old overhead service to 200amp · 93 m away
- 8807 Clarewood DrJul 8, 2024Replacement of complete existing central heat and air system with or without duct work · 98 m away
- 8805 Brookfield DrJul 17, 2024Addition and remodel expanding the owner bathroom owner suite and kitchen · 99 m away
- 8903 Tronewood DrJan 9, 2024Repair on breaker panel · 137 m away
- 1402 Fairfield DrAug 14, 2026Approx. 70 ft long tunnel work for: two bathrooms kitchen & washer. sewer line would be approx. 30 ft from the city cleanout to the house · 156 m away
- 8904 Tronewood DrJun 23, 2026Installing a new 125a service sub panel and 100a ac disconnect upgrading the mpu to 200a* installation of battery to the solar system · 161 m away
- 8901 Covey CtDec 18, 2025Replace 50 gallon natural gas water heater · 166 m away
- 8800 Parkfield DrOct 7, 2026Existing unpermitted wood-framed addition on slab-on-grade covered screened deck uncovered composite wood deck two landscape paver paths and one paver pad to be retroactively permitted. all structures extend off the rear of the existing house · 168 m away
- 8611 Clarewood DrNov 14, 2025Install new 4.350 kw rooftop solar system for existing residential only · 172 m away