8807 Redfield Ln
Austin, TX 78758
Electrical and plumbing work at 8807 Redfield Ln
Austin permits indicate electrical and plumbing maintenance at 8807 Redfield Ln, filed November 3 and December 15, 2023. The work includes replacing an electrical subpanel and replacing the gas line to a water heater and the main building to restore gas service to the community.
Summarized from City of Austin records · updated Dec 15, 2023
- Projects
- 2
- 2 filings
- Latest filing
- Dec 15, 2023
- since Dec 15, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit pendingReplace existing subpanel
- AppliedDec 13, 2023
- IssuedDec 15, 2023
- WorkDec '23 – Dec '23
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplace existing subpanel
Replace existing subpanel
City of Austin permitElectrical PermitPending- Record
- 2023-159272 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace gas to water heater to the main building and to get the gas turned on in the community
Replace gas to water heater to the main building and to get the gas turned on in the community
City of Austin permitPlumbing PermitFinal- Record
- 2023-140895 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8807 Redfield Ln
What is being built at 8807 Redfield Ln?
The permits describe electrical and plumbing work, not a new building: replacing an existing subpanel and replacing gas piping to a water heater and the main building.
When were permits filed for 8807 Redfield Ln?
The plumbing permit was filed November 3, 2023, and the electrical permit was filed December 15, 2023.
What electrical work is planned at 8807 Redfield Ln?
Permit 2023-159272 EP, filed December 15, 2023, describes replacing an existing subpanel. Its status is pending.
What plumbing work is planned at 8807 Redfield Ln?
Permit 2023-140895 PP, filed November 3, 2023, describes replacing gas piping to the water heater and main building to get gas turned on in the community. Its status is final.
Is a new building planned at 8807 Redfield Ln?
The two Austin permit records describe subpanel and gas-line replacement work; they do not describe construction of a new building.
Also being built nearby
All of 78758- 8803 Redfield LnOct 10, 20251.tunnel under home to replace sewer line 50 2.sewer line in the yard which will be approx 48 front yard · 42 m away
- 8801 Redfield LnOct 10, 2024New irrigation system to backyard only · 61 m away
- 8805 Brookfield DrJul 17, 2024Addition and remodel expanding the owner bathroom owner suite and kitchen · 91 m away
- 8803 Brookfield DrSep 21, 2024Upgrade an existing old overhead service to 200amp · 93 m away
- 8807 Clarewood DrJul 8, 2024Replacement of complete existing central heat and air system with or without duct work · 98 m away
- 8903 Tronewood DrJan 9, 2024Repair on breaker panel · 97 m away
- 8706 Brookfield DrAug 5, 2026Installation of 6.16kw solar pv system · 116 m away
- 8904 Tronewood DrJun 23, 2026Installing a new 125a service sub panel and 100a ac disconnect upgrading the mpu to 200a* installation of battery to the solar system · 119 m away
- 8901 Covey CtDec 18, 2025Replace 50 gallon natural gas water heater · 126 m away
- 8902 Trone CirNov 14, 2025We are replacing the water line for unit c and unit d · 139 m away
- 8903 Covey CtNov 4, 2025Express: replace siding by the front back right and left side · 146 m away
- 1505 Westbury TrlJun 10, 2024Replacement of complete existing central heat and air system with or without duct work · 155 m away