8902 Tina Ct
Austin, TX 78758
8902 Tina Ct: 1 project on record
City of Austin lists 1 filing across 1 project at 8902 Tina Ct, Austin, TX 78758. The most recent, filed November 18, 2026, covers: “Express- replace old windows”.
Compiled from City of Austin records · updated Nov 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 18, 2026
- since Nov 18, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayExpress- replace old windows
- AppliedNov 4, 2026
- IssuedNov 18, 2026
- WorkNov '26 – May '27
- Final inspection
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress- replace old windows
Express- replace old windows
City of Austin permitBuilding PermitActive- Record
- 2026-145919 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8902 Tina Ct
What is being built at 8902 Tina Ct?
The latest filing (City of Austin permit 2026-145919 BP, November 18, 2026) covers express- replace old windows.
How many permits and filings does 8902 Tina Ct have?
1 filing across 1 project, from November 18, 2026 to November 18, 2026.
Is there other construction near 8902 Tina Ct?
Yes. Nearby filings include 912 Maryland Dr (replacement of complete existing central heat and air system with or without duct work, Dec 28, 2023); 903 Kirschner Pl (express: replace 1 window like for like, Apr 17, 2025); 910 Maryland Dr (replacement of complete existing central heat and air system with or without duct work, Jul 26, 2024).
How do I get alerts for new permits at 8902 Tina Ct?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78758- 912 Maryland DrDec 28, 2023Replacement of complete existing central heat and air system with or without duct work · 70 m away
- 903 Kirschner PlApr 17, 2025Express: replace 1 window like for like · 79 m away
- 910 Maryland DrJul 26, 2024Replacement of complete existing central heat and air system with or without duct work · 81 m away
- 906 Kirschner PlJan 3, 2024Replacement of complete existing central heat and air system with or without duct work · 83 m away
- 906 Maryland DrJul 17, 2024Replacement of an existing water heater 40 gal gas · 101 m away
- 8927 Quail Creek DrMar 9, 2026Replacement of complete existing central heat and air system with or without duct work · 115 m away
- 909 Maryland DrJan 21, 2025Request to disconnect 200 amp service upgrade with new 200 amp mcb load center whole house surge protection additional grounding and inter-system ground · 122 m away
- 903 Maryland DrJun 8, 2026Access pit for tunnel work excavate an access pit to commence a tunnel excavation price is per pit to gain access under the foundation perimeter. additional access pit for sewer excavation under a home complete re-pipe from city tap to kitchen laundry room and two bathrooms so require 70 feet of tunnel and 25 to 35 feet of trench to get to the city tap in front yard also includes two new cleanouts one for the city and one for the customers home · 122 m away
- 919 Maryland DrDec 7, 20235.0 tunnel for spot repair on sewer line per pp agent ariel: not working with gc and all existing piping would be to re-pipe the hot and cold lines for 11 fixtures kitchen laundry half bathroom downstairs and full bathroom upstairs. * installation of pex pipe 3/4 for main run and 1/2 pex to all fixtures. at kitchen laundry half bath downstairs and full bath upstairs · 125 m away
- 910 Conrad StMay 24, 2024Emergency service upgrade replacing meter can meter panel and wiring. ae cut off power due to wire damages**customer without power · 151 m away
- 901 Conrad StSep 22, 2026Base: installing a backup battery system and additional meter socket · 156 m away
- 9001 Quail Creek DrMar 12, 2026Replacement of complete existing central heat and air system with or without duct work 4-ton condenser change-out in backyard & 88k btu furnace change-out in attic · 156 m away