Sewer and plumbing work permitted at 903 Maryland Dr
A City of Austin permit describes an access pit for tunnel excavation and a sewer re-pipe at 903 Maryland Dr. The permit was filed June 8, 2026, and its status is Final.
Summarized from City of Austin records · updated Jun 8, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 8, 2026
- since Jun 8, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledAccess pit for tunnel work excavate an access pit to commence a tunnel excavation price is per pit to gain access under the foundation perimeter. additional access pit for sewer excavation under a home complete re-pipe from city tap to kitchen laundry room and two bathrooms so require 70 feet of tunnel and 25 to 35 feet of trench to get to the city tap in front yard also includes two new cleanouts one for the city and one for the customers home
- AppliedJun 5, 2026
- IssuedJun 8, 2026
- WorkJun '26 – Aug '26
- Final inspectionAug 18, 2026
Passed final inspection Aug 18, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectAccess pit for tunnel work excavate an access pit to commence a tunnel excavation price is per pit to gain access under the foundation perimeter. additional access pit for sewer excavation under a home complete re-pipe from city tap to kitchen laundry room and two bathrooms so require 70 feet of tunnel and 25 to 35 feet of trench to get to the city tap in front yard also includes two new cleanouts one for the city and one for the customers home
Access pit for tunnel work excavate an access pit to commence a tunnel excavation price is per pit to gain access under the foundation perimeter. additional access pit for sewer excavation under a home complete re-pipe from city tap to kitchen laundry room and two bathrooms so require 70 feet of tunnel and 25 to 35 feet of trench to get to the city tap in front yard also includes two new cleanouts one for the city and one for the customers home
City of Austin permitPlumbing PermitFinal- Record
- 2026-071655 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 903 Maryland Dr
What is being built at 903 Maryland Dr?
A City of Austin plumbing permit describes an access pit for tunnel work and a sewer re-pipe from the city tap to the home. The permit was filed June 8, 2026.
Is a restaurant opening at 903 Maryland Dr?
The permit record describes sewer and plumbing work at a home; it does not identify a restaurant.
What plumbing work is planned at 903 Maryland Dr?
The permit describes a complete re-pipe from the city tap to the kitchen, laundry room, and two bathrooms. It also lists two new cleanouts.
Why is there tunnel work at 903 Maryland Dr?
The permit describes an access pit for tunnel excavation to reach sewer lines beneath the home's foundation perimeter.
When was the plumbing permit filed for 903 Maryland Dr?
The City of Austin permit, 2026-071655 PP, was filed June 8, 2026.
What is the status of permit 2026-071655 PP?
The City of Austin record lists the permit status as Final.
Also being built nearby
All of 78758- 906 Maryland DrJul 17, 2024Replacement of an existing water heater 40 gal gas · 25 m away
- 909 Maryland DrJan 21, 2025Request to disconnect 200 amp service upgrade with new 200 amp mcb load center whole house surge protection additional grounding and inter-system ground · 31 m away
- 910 Maryland DrJul 26, 2024Replacement of complete existing central heat and air system with or without duct work · 47 m away
- 912 Maryland DrDec 28, 2023Replacement of complete existing central heat and air system with or without duct work · 71 m away
- 912 Connecticut DrMay 6, 2024Sub panel replacement · 73 m away
- 807 Maryland DrMay 18, 2026Installation of new 200a overhead riser 200r meter can and 200a main breaker panel - remove existing aged equipment · 96 m away
- 909 Connecticut DrSep 6, 2024Ae pulled meter due to arcing leg in meter can. repaired left leg · 106 m away
- 918 Connecticut DrDec 5, 2024Replacement of an existing water heater · 119 m away
- 8702 Bridgeport DrSep 19, 2024Interior remodel including expanding the half bath to full bath remodeling the existing full bathrooms relocating the kitchen & replacing the windows & doors · 119 m away
- 919 Maryland DrDec 7, 20235.0 tunnel for spot repair on sewer line per pp agent ariel: not working with gc and all existing piping would be to re-pipe the hot and cold lines for 11 fixtures kitchen laundry half bathroom downstairs and full bathroom upstairs. * installation of pex pipe 3/4 for main run and 1/2 pex to all fixtures. at kitchen laundry half bath downstairs and full bath upstairs · 121 m away
- 8902 Tina CtNov 18, 2026Express- replace old windows · 122 m away
- 913 Connecticut DrFeb 20, 2026Emergency repair of water yard line approximately 40ft. excavation of tunnels to repair and replace plumbing lines located underneath the home. repair drainage pipe located above the garage for the washing machine and install proper venting. installation of new yard line. replacement of existing cast iron piping under the home with pvc schedule 40 piping in compliance with city plumbing codes · 127 m away
More restaurants in 78758.