909 Connecticut Dr
Austin, TX 78758
909 Connecticut Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 909 Connecticut Dr, Austin, TX 78758. The most recent, filed September 6, 2024, covers: “Ae pulled meter due to arcing leg in meter can. repaired left leg”.
Compiled from City of Austin records · updated Sep 6, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 6, 2024
- since Sep 6, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledAe pulled meter due to arcing leg in meter can. repaired left leg
- AppliedSep 3, 2024
- IssuedSep 6, 2024
- WorkSep '24 – Sep '24
- Final inspectionSep 11, 2024
Passed final inspection Sep 11, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectAe pulled meter due to arcing leg in meter can. repaired left leg
Ae pulled meter due to arcing leg in meter can. repaired left leg
City of Austin permitElectrical PermitFinal- Record
- 2024-112587 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 909 Connecticut Dr
What is being built at 909 Connecticut Dr?
The latest filing (City of Austin permit 2024-112587 EP, September 6, 2024) covers ae pulled meter due to arcing leg in meter can. repaired left leg.
How many permits and filings does 909 Connecticut Dr have?
1 filing across 1 project, from September 6, 2024 to September 6, 2024.
Is there other construction near 909 Connecticut Dr?
Yes. Nearby filings include 913 Connecticut Dr (emergency repair of water yard line approximately 40ft. excavation of tunnels to repair and replace plumbing lines located underneath the home. repair drainage pipe located above the garage for the washing machine and install proper venting. installation of new yard line. replacement of existing cast iron piping under the home with pvc schedule 40 piping in compliance with city plumbing codes, Feb 20, 2026); 912 Connecticut Dr (sub panel replacement, May 6, 2024); 918 Connecticut Dr (replacement of an existing water heater, Dec 5, 2024).
How do I get alerts for new permits at 909 Connecticut Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78758- 913 Connecticut DrFeb 20, 2026Emergency repair of water yard line approximately 40ft. excavation of tunnels to repair and replace plumbing lines located underneath the home. repair drainage pipe located above the garage for the washing machine and install proper venting. installation of new yard line. replacement of existing cast iron piping under the home with pvc schedule 40 piping in compliance with city plumbing codes · 36 m away
- 912 Connecticut DrMay 6, 2024Sub panel replacement · 36 m away
- 918 Connecticut DrDec 5, 2024Replacement of an existing water heater · 71 m away
- 8600 Bridgeport DrApr 7, 2025Replacement of complete existing central heat and air system with or without duct work · 82 m away
- 909 Maryland DrJan 21, 2025Request to disconnect 200 amp service upgrade with new 200 amp mcb load center whole house surge protection additional grounding and inter-system ground · 83 m away
- 8600 Delaware CtSep 4, 2025Replacement of complete existing central heat and air system with or without duct work · 98 m away
- 903 Maryland DrJun 8, 2026Access pit for tunnel work excavate an access pit to commence a tunnel excavation price is per pit to gain access under the foundation perimeter. additional access pit for sewer excavation under a home complete re-pipe from city tap to kitchen laundry room and two bathrooms so require 70 feet of tunnel and 25 to 35 feet of trench to get to the city tap in front yard also includes two new cleanouts one for the city and one for the customers home · 106 m away
- 919 Maryland DrDec 7, 20235.0 tunnel for spot repair on sewer line per pp agent ariel: not working with gc and all existing piping would be to re-pipe the hot and cold lines for 11 fixtures kitchen laundry half bathroom downstairs and full bathroom upstairs. * installation of pex pipe 3/4 for main run and 1/2 pex to all fixtures. at kitchen laundry half bath downstairs and full bath upstairs · 110 m away
- 910 Maryland DrJul 26, 2024Replacement of complete existing central heat and air system with or without duct work · 120 m away
- 906 Maryland DrJul 17, 2024Replacement of an existing water heater 40 gal gas · 127 m away
- 912 Maryland DrDec 28, 2023Replacement of complete existing central heat and air system with or without duct work · 127 m away
- 8702 Bridgeport DrSep 19, 2024Interior remodel including expanding the half bath to full bath remodeling the existing full bathrooms relocating the kitchen & replacing the windows & doors · 138 m away