8600 Delaware Ct
Austin, TX 78758
8600 Delaware Ct: 1 project on record
City of Austin lists 1 filing across 1 project at 8600 Delaware Ct, Austin, TX 78758. The most recent, filed September 4, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Sep 4, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 4, 2025
- since Sep 4, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedSep 3, 2025
- IssuedSep 4, 2025
- WorkSep '25 – Sep '25
- Final inspectionSep 9, 2025
Passed final inspection Sep 9, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-111509 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8600 Delaware Ct
What is being built at 8600 Delaware Ct?
The latest filing (City of Austin permit 2025-111509 MP, September 4, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 8600 Delaware Ct have?
1 filing across 1 project, from September 4, 2025 to September 4, 2025.
Is there other construction near 8600 Delaware Ct?
Yes. Nearby filings include 8600 Bridgeport Dr (replacement of complete existing central heat and air system with or without duct work, Apr 7, 2025); 913 Connecticut Dr (emergency repair of water yard line approximately 40ft. excavation of tunnels to repair and replace plumbing lines located underneath the home. repair drainage pipe located above the garage for the washing machine and install proper venting. installation of new yard line. replacement of existing cast iron piping under the home with pvc schedule 40 piping in compliance with city plumbing codes, Feb 20, 2026); 909 Connecticut Dr (ae pulled meter due to arcing leg in meter can. repaired left leg, Sep 6, 2024).
How do I get alerts for new permits at 8600 Delaware Ct?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78758- 8600 Bridgeport DrApr 7, 2025Replacement of complete existing central heat and air system with or without duct work · 64 m away
- 913 Connecticut DrFeb 20, 2026Emergency repair of water yard line approximately 40ft. excavation of tunnels to repair and replace plumbing lines located underneath the home. repair drainage pipe located above the garage for the washing machine and install proper venting. installation of new yard line. replacement of existing cast iron piping under the home with pvc schedule 40 piping in compliance with city plumbing codes · 93 m away
- 909 Connecticut DrSep 6, 2024Ae pulled meter due to arcing leg in meter can. repaired left leg · 98 m away
- 912 Connecticut DrMay 6, 2024Sub panel replacement · 134 m away
- 918 Connecticut DrDec 5, 2024Replacement of an existing water heater · 137 m away
- 833 Fairfield DrAug 25, 2025Replace like for like after a car damage · 139 m away
- 1001 Chesapeake DrSep 18, 2026Exterior electrical service upgrade: install a new 200-amp meter box. install a 200-amp main disconnect. install new service drop cables. install a new 2-inch rigid conduit for the service drop. install grounding rods · 145 m away
- 8521 Jamestown DrOct 22, 2026200amp service replacement. ae is the electrical provider · 177 m away
- 1000 Alden DrOct 21, 202535 trench to replace yard sewer and 65 tunnel below the foundation to replace entire drain system. 3 access holes- left left back · 181 m away
- 909 Maryland DrJan 21, 2025Request to disconnect 200 amp service upgrade with new 200 amp mcb load center whole house surge protection additional grounding and inter-system ground · 182 m away
- 919 Maryland DrDec 7, 20235.0 tunnel for spot repair on sewer line per pp agent ariel: not working with gc and all existing piping would be to re-pipe the hot and cold lines for 11 fixtures kitchen laundry half bathroom downstairs and full bathroom upstairs. * installation of pex pipe 3/4 for main run and 1/2 pex to all fixtures. at kitchen laundry half bath downstairs and full bath upstairs · 182 m away
- 1008 Chesapeake DrApr 17, 2024Replacement of complete existing central heat and air system with or without duct work · 198 m away