9000 W Pointer Ln
Austin, TX 78758
9000 W Pointer Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 9000 W Pointer Ln, Austin, TX 78758. The most recent, filed August 3, 2026, covers: “200a service upgrade”.
Compiled from City of Austin records · updated Aug 3, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 3, 2026
- since Aug 3, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 project200a service upgrade
200a service upgrade
City of Austin permitElectrical PermitFinal- Record
- 2026-090820 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9000 W Pointer Ln
What is being built at 9000 W Pointer Ln?
The latest filing (City of Austin permit 2026-090820 EP, August 3, 2026) covers 200a service upgrade.
How many permits and filings does 9000 W Pointer Ln have?
1 filing across 1 project, from August 3, 2026 to August 3, 2026.
Is there other construction near 9000 W Pointer Ln?
Yes. Nearby filings include 9002 W Pointer Ln (replacement of complete existing central heat and air system with or without duct work, Mar 15, 2024); 9004 W Pointer Ln (locked out gas meter. perform air test on gas system for city inspection, Jun 25, 2024); 8913 Pointer Ln (replacement of complete existing central heat and air system with or without duct work, Jul 7, 2026).
How do I get alerts for new permits at 9000 W Pointer Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78758- 9002 W Pointer LnMar 15, 2024Replacement of complete existing central heat and air system with or without duct work · 19 m away
- 9004 W Pointer LnJun 25, 2024Locked out gas meter. perform air test on gas system for city inspection · 40 m away
- 8913 Pointer LnJul 7, 2026Replacement of complete existing central heat and air system with or without duct work · 63 m away
- 9005 W Pointer LnDec 18, 2023Install level 2 ev charger per austin energys plug-in rebate guidelines · 81 m away
- 9007 W Pointer LnMay 15, 202515ft tunnel to repair drain line · 98 m away
- 8910 Briardale DrMay 30, 2025Excavate 24 tunnel to repair main drain line under house serving laundry excavate 10 to repair sewer yard line · 108 m away
- 8930 Galewood DrOct 14, 2026Emergency repair: replace burnt wires in gutter at building. c for units 109 110 209 and 210 · 109 m away
- 9006 Briardale DrMar 6, 2025Tunnel under foundation to replace all waste lines and replace main sewer line up to city tap · 109 m away
- 8906 Pointer LnJun 18, 2026Main panel upgrade · 112 m away
- 9009 W Pointer LnNov 1, 2024Replacement of complete existing central heat and air system with or without duct work · 118 m away
- 8908 Briardale DrDec 27, 2024Replacement of complete existing central heat and air system with or without duct work 1 system 3 ton gas furnace straight cool · 123 m away
- 9001 Briardale DrJan 6, 2026Addition and remodel - see attachments hvac work ductwork modifications**: inspect and modify existing ductwork to enhance airflow and efficiency. seal any leaks and insulate ducts where necessary ensuring optimal performance of the new hvac system. thermostat replacement**: replace outdated thermostats with programmable models for better energy management. ensure proper calibration and connection to the new hvac system for accurate temperature control. line change services**: replace refrigerant lines that have worn or deteriorated over time. ensure proper insulation and secure connections to improve efficiency and prevent leaks. system maintenance**: conduct thorough maintenance of the new hvac unit including filter replacements coil cleaning and system diagnostics to ensure peak performance and extend the units lifespan · 129 m away