9002 W Pointer Ln
Austin, TX 78758
9002 W Pointer Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 9002 W Pointer Ln, Austin, TX 78758. The most recent, filed March 15, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Mar 15, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 15, 2024
- since Mar 15, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-031427 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9002 W Pointer Ln
What is being built at 9002 W Pointer Ln?
The latest filing (City of Austin permit 2024-031427 MP, March 15, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 9002 W Pointer Ln have?
1 filing across 1 project, from March 15, 2024 to March 15, 2024.
Is there other construction near 9002 W Pointer Ln?
Yes. Nearby filings include 9000 W Pointer Ln (200a service upgrade, Aug 3, 2026); 9004 W Pointer Ln (locked out gas meter. perform air test on gas system for city inspection, Jun 25, 2024); 9005 W Pointer Ln (install level 2 ev charger per austin energys plug-in rebate guidelines, Dec 18, 2023).
How do I get alerts for new permits at 9002 W Pointer Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78758- 9000 W Pointer LnAug 3, 2026200a service upgrade · 19 m away
- 9004 W Pointer LnJun 25, 2024Locked out gas meter. perform air test on gas system for city inspection · 20 m away
- 9005 W Pointer LnDec 18, 2023Install level 2 ev charger per austin energys plug-in rebate guidelines · 66 m away
- 8913 Pointer LnJul 7, 2026Replacement of complete existing central heat and air system with or without duct work · 77 m away
- 9007 W Pointer LnMay 15, 202515ft tunnel to repair drain line · 82 m away
- 9006 Briardale DrMar 6, 2025Tunnel under foundation to replace all waste lines and replace main sewer line up to city tap · 97 m away
- 9009 W Pointer LnNov 1, 2024Replacement of complete existing central heat and air system with or without duct work · 100 m away
- 8930 Galewood DrOct 14, 2026Emergency repair: replace burnt wires in gutter at building. c for units 109 110 209 and 210 · 121 m away
- 8910 Briardale DrMay 30, 2025Excavate 24 tunnel to repair main drain line under house serving laundry excavate 10 to repair sewer yard line · 122 m away
- 9001 Briardale DrJan 6, 2026Addition and remodel - see attachments hvac work ductwork modifications**: inspect and modify existing ductwork to enhance airflow and efficiency. seal any leaks and insulate ducts where necessary ensuring optimal performance of the new hvac system. thermostat replacement**: replace outdated thermostats with programmable models for better energy management. ensure proper calibration and connection to the new hvac system for accurate temperature control. line change services**: replace refrigerant lines that have worn or deteriorated over time. ensure proper insulation and secure connections to improve efficiency and prevent leaks. system maintenance**: conduct thorough maintenance of the new hvac unit including filter replacements coil cleaning and system diagnostics to ensure peak performance and extend the units lifespan · 131 m away
- 8906 Pointer LnJun 18, 2026Main panel upgrade · 131 m away
- 8908 Briardale DrDec 27, 2024Replacement of complete existing central heat and air system with or without duct work 1 system 3 ton gas furnace straight cool · 138 m away