9006 Briardale Dr
Austin, TX 78758
9006 Briardale Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 9006 Briardale Dr, Austin, TX 78758 since July 9, 2024. The most recent, filed March 6, 2025, covers: “Tunnel under foundation to replace all waste lines and replace main sewer line up to city tap”.
Compiled from City of Austin records · updated Mar 6, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Mar 6, 2025
- since Jul 9, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel under foundation to replace all waste lines and replace main sewer line up to city tap
- AppliedFeb 18, 2025
- IssuedMar 6, 2025
- WorkMar '25 – Mar '25
- Final inspectionMar 17, 2025
Passed final inspection Mar 17, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsTunnel under foundation to replace all waste lines and replace main sewer line up to city tap
Tunnel under foundation to replace all waste lines and replace main sewer line up to city tap
City of Austin permitPlumbing PermitFinal- Record
- 2025-019220 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
40 ft tunnel to repair sewer line
40 ft tunnel to repair sewer line
City of Austin permitPlumbing PermitFinal- Record
- 2024-077285 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9006 Briardale Dr
What is being built at 9006 Briardale Dr?
The latest filing (City of Austin permit 2025-019220 PP, March 6, 2025) covers tunnel under foundation to replace all waste lines and replace main sewer line up to city tap.
How many permits and filings does 9006 Briardale Dr have?
2 filings across 2 projects, from July 9, 2024 to March 6, 2025.
Is there other construction near 9006 Briardale Dr?
Yes. Nearby filings include 9005 W Pointer Ln (install level 2 ev charger per austin energys plug-in rebate guidelines, Dec 18, 2023); 9007 W Pointer Ln (15ft tunnel to repair drain line, May 15, 2025); 9009 Briardale Dr (express: replace existing master bathroom shower with new shower and valve (like for like), Jun 25, 2024).
How do I get alerts for new permits at 9006 Briardale Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78758- 9005 W Pointer LnDec 18, 2023Install level 2 ev charger per austin energys plug-in rebate guidelines · 34 m away
- 9007 W Pointer LnMay 15, 202515ft tunnel to repair drain line · 35 m away
- 9009 Briardale DrJun 25, 2024Express: replace existing master bathroom shower with new shower and valve (like for like) · 48 m away
- 9009 W Pointer LnNov 1, 2024Replacement of complete existing central heat and air system with or without duct work · 51 m away
- 9004 W Pointer LnJun 25, 2024Locked out gas meter. perform air test on gas system for city inspection · 89 m away
- 9001 Briardale DrJan 6, 2026Addition and remodel - see attachments hvac work ductwork modifications**: inspect and modify existing ductwork to enhance airflow and efficiency. seal any leaks and insulate ducts where necessary ensuring optimal performance of the new hvac system. thermostat replacement**: replace outdated thermostats with programmable models for better energy management. ensure proper calibration and connection to the new hvac system for accurate temperature control. line change services**: replace refrigerant lines that have worn or deteriorated over time. ensure proper insulation and secure connections to improve efficiency and prevent leaks. system maintenance**: conduct thorough maintenance of the new hvac unit including filter replacements coil cleaning and system diagnostics to ensure peak performance and extend the units lifespan · 95 m away
- 9002 W Pointer LnMar 15, 2024Replacement of complete existing central heat and air system with or without duct work · 97 m away
- 1607 Colony Creek DrAug 25, 2009Settlement home; the · 105 m away
- 1700 Colony Creek DrOct 25, 2024Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw · 109 m away
- 9000 W Pointer LnAug 3, 2026200a service upgrade · 109 m away
- 8913 Pointer LnJul 7, 2026Replacement of complete existing central heat and air system with or without duct work · 122 m away
- 1704 Colony Creek DrApr 30, 2026Replacement of complete existing central heat and air system with or without duct work like for like replacement of existing condenser furnace thermostat and plenum · 131 m away