9007 W Pointer Ln
Austin, TX 78758
9007 W Pointer Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 9007 W Pointer Ln, Austin, TX 78758. The most recent, filed May 15, 2025, covers: “15ft tunnel to repair drain line”.
Compiled from City of Austin records · updated May 15, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 15, 2025
- since May 15, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 project15ft tunnel to repair drain line
15ft tunnel to repair drain line
City of Austin permitPlumbing PermitFinal- Record
- 2025-059446 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9007 W Pointer Ln
What is being built at 9007 W Pointer Ln?
The latest filing (City of Austin permit 2025-059446 PP, May 15, 2025) covers 15ft tunnel to repair drain line.
How many permits and filings does 9007 W Pointer Ln have?
1 filing across 1 project, from May 15, 2025 to May 15, 2025.
Is there other construction near 9007 W Pointer Ln?
Yes. Nearby filings include 9005 W Pointer Ln (install level 2 ev charger per austin energys plug-in rebate guidelines, Dec 18, 2023); 9009 W Pointer Ln (replacement of complete existing central heat and air system with or without duct work, Nov 1, 2024); 9006 Briardale Dr (tunnel under foundation to replace all waste lines and replace main sewer line up to city tap, Mar 6, 2025).
How do I get alerts for new permits at 9007 W Pointer Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78758- 9005 W Pointer LnDec 18, 2023Install level 2 ev charger per austin energys plug-in rebate guidelines · 21 m away
- 9009 W Pointer LnNov 1, 2024Replacement of complete existing central heat and air system with or without duct work · 24 m away
- 9006 Briardale DrMar 6, 2025Tunnel under foundation to replace all waste lines and replace main sewer line up to city tap · 35 m away
- 9004 W Pointer LnJun 25, 2024Locked out gas meter. perform air test on gas system for city inspection · 67 m away
- 9009 Briardale DrJun 25, 2024Express: replace existing master bathroom shower with new shower and valve (like for like) · 81 m away
- 9002 W Pointer LnMar 15, 2024Replacement of complete existing central heat and air system with or without duct work · 82 m away
- 9000 W Pointer LnAug 3, 2026200a service upgrade · 98 m away
- 1700 Colony Creek DrOct 25, 2024Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw · 110 m away
- 1704 Colony Creek DrApr 30, 2026Replacement of complete existing central heat and air system with or without duct work like for like replacement of existing condenser furnace thermostat and plenum · 120 m away
- 9001 Briardale DrJan 6, 2026Addition and remodel - see attachments hvac work ductwork modifications**: inspect and modify existing ductwork to enhance airflow and efficiency. seal any leaks and insulate ducts where necessary ensuring optimal performance of the new hvac system. thermostat replacement**: replace outdated thermostats with programmable models for better energy management. ensure proper calibration and connection to the new hvac system for accurate temperature control. line change services**: replace refrigerant lines that have worn or deteriorated over time. ensure proper insulation and secure connections to improve efficiency and prevent leaks. system maintenance**: conduct thorough maintenance of the new hvac unit including filter replacements coil cleaning and system diagnostics to ensure peak performance and extend the units lifespan · 124 m away
- 1607 Colony Creek DrAug 25, 2009Settlement home; the · 128 m away
- 8913 Pointer LnJul 7, 2026Replacement of complete existing central heat and air system with or without duct work · 129 m away