9806 Mountain Quail Rd
Austin, TX 78758
9806 Mountain Quail Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 9806 Mountain Quail Rd, Austin, TX 78758. The most recent, filed May 9, 2025, covers: “This project involves repairing a damaged sewer line. a camera inspection will be used to locate any breaks or blockages in the existing pipe. repairs will be completed using non-invasive methods and the line will be stabilized to ensure proper and long-lasting function”.
Compiled from City of Austin records · updated May 9, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 9, 2025
- since May 9, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledThis project involves repairing a damaged sewer line. a camera inspection will be used to locate any breaks or blockages in the existing pipe. repairs will be completed using non-invasive methods and the line will be stabilized to ensure proper and long-lasting function
- AppliedMay 1, 2025
- IssuedMay 9, 2025
- WorkMay '25 – Aug '25
- Final inspectionAug 6, 2025
Passed final inspection Aug 6, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectThis project involves repairing a damaged sewer line. a camera inspection will be used to locate any breaks or blockages in the existing pipe. repairs will be completed using non-invasive methods and the line will be stabilized to ensure proper and long-lasting function
This project involves repairing a damaged sewer line. a camera inspection will be used to locate any breaks or blockages in the existing pipe. repairs will be completed using non-invasive methods and the line will be stabilized to ensure proper and long-lasting function
City of Austin permitPlumbing PermitFinal- Record
- 2025-054255 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9806 Mountain Quail Rd
What is being built at 9806 Mountain Quail Rd?
The latest filing (City of Austin permit 2025-054255 PP, May 9, 2025) covers this project involves repairing a damaged sewer line. a camera inspection will be used to locate any breaks or blockages in the existing pipe. repairs will be completed using non-invasive methods and the line will be stabilized to ensure proper and long-lasting function.
How many permits and filings does 9806 Mountain Quail Rd have?
1 filing across 1 project, from May 9, 2025 to May 9, 2025.
Is there other construction near 9806 Mountain Quail Rd?
Yes. Nearby filings include 9902 Mountain Quail Rd (main panel changeout, Aug 24, 2026); 9903 Mountain Quail Rd (replacement of complete existing central heat and air system with or without duct work, Sep 9, 2026); 9902 Oak Run Dr (replacement of complete existing central heat and air system with or without duct work, Aug 12, 2024).
How do I get alerts for new permits at 9806 Mountain Quail Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78758- 9902 Mountain Quail RdAug 24, 2026Main panel changeout · 52 m away
- 9903 Mountain Quail RdSep 9, 2026Replacement of complete existing central heat and air system with or without duct work · 63 m away
- 9902 Oak Run DrAug 12, 2024Replacement of complete existing central heat and air system with or without duct work · 88 m away
- 9814 Oak Run DrMar 20, 2025Irrigation only in backyard · 99 m away
- 10004 Oak Hollow DrFeb 1, 2024Siebers - install new 5.475kw rooftop solar system to existing residential only using backfed breaker · 110 m away
- 9802 Oak Run DrMay 9, 2025Replacement of an existing water heater · 118 m away
- 9901 Chukar CirJul 7, 2025Replacement of complete existing central heat and air system with or without duct work upflow garage closet · 137 m away
- 9806 Oak Run DrMay 1, 2025Replacement of complete existing central heat and air system with or without duct work · 137 m away
- 10101 Chukar CirJul 3, 2024Replacement of complete existing central heat and air system with or without duct work · 142 m away
- 1529 Desert Quail LnSep 14, 2025Make an (estimated) 15 ft spot repair to main sewer line. **per pc work is being done on the yard line · 158 m away
- 1527 Desert Quail LnApr 17, 2025Replacement of an existing water heater · 161 m away
- 1604 Springer LnOct 13, 2026Interior remodel- full home remodel all bathrooms (tile and fixtures no plumbing relocation in brs) and kitchen. new added load bearing beam for support. replaced siding and roof. installed new ac unit. new insulation in attic · 165 m away