9806 Oak Run Dr
Austin, TX 78758
9806 Oak Run Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 9806 Oak Run Dr, Austin, TX 78758. The most recent, filed May 1, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated May 1, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 1, 2025
- since May 1, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedApr 29, 2025
- IssuedMay 1, 2025
- WorkMay '25 – May '25
- Final inspectionMay 9, 2025
Passed final inspection May 9, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-052822 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9806 Oak Run Dr
What is being built at 9806 Oak Run Dr?
The latest filing (City of Austin permit 2025-052822 MP, May 1, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 9806 Oak Run Dr have?
1 filing across 1 project, from May 1, 2025 to May 1, 2025.
Is there other construction near 9806 Oak Run Dr?
Yes. Nearby filings include 1608 Springer Ln (replace 1/2 gas stop and supply line to water heater 1.) eliminate 3/4 gas line in wall by cutting pipe and capping off pipe. 2.) make access by removing sheet rock wall and cabinet wall to locate gas pipe. test whole house for leaks, Nov 2, 2026); 1604 Springer Ln (interior remodel- full home remodel all bathrooms (tile and fixtures no plumbing relocation in brs) and kitchen. new added load bearing beam for support. replaced siding and roof. installed new ac unit. new insulation in attic, Oct 13, 2026); 9802 Oak Run Dr (replacement of an existing water heater, May 9, 2025).
How do I get alerts for new permits at 9806 Oak Run Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78758- 1608 Springer LnNov 2, 2026Replace 1/2 gas stop and supply line to water heater 1.) eliminate 3/4 gas line in wall by cutting pipe and capping off pipe. 2.) make access by removing sheet rock wall and cabinet wall to locate gas pipe. test whole house for leaks · 45 m away
- 1604 Springer LnOct 13, 2026Interior remodel- full home remodel all bathrooms (tile and fixtures no plumbing relocation in brs) and kitchen. new added load bearing beam for support. replaced siding and roof. installed new ac unit. new insulation in attic · 45 m away
- 9802 Oak Run DrMay 9, 2025Replacement of an existing water heater · 47 m away
- 9814 Oak Run DrMar 20, 2025Irrigation only in backyard · 89 m away
- 1603 Springer LnJun 20, 2024Replacement of complete existing central heat and air system with or without duct work · 94 m away
- 1611 Springer LnNov 17, 2026Replace the sewer line in the yard due to multiple root intrusions and breaks. total run will be 50 feet. we will replace from the exterior clean out in the back yard to the city tap at the sidewalk in the front yard · 96 m away
- 9706 Mountain Quail RdMar 4, 2024Trench and replace sewer yard line · 107 m away
- 9806 Chukar CirDec 22, 2025Replace 30ft of sewer line · 128 m away
- 9901 Chukar CirJul 7, 2025Replacement of complete existing central heat and air system with or without duct work upflow garage closet · 129 m away
- 9706 Chukar CirJun 9, 2026Sewer yard line repair roughly 30ft · 132 m away
- 9902 Oak Run DrAug 12, 2024Replacement of complete existing central heat and air system with or without duct work · 135 m away
- 9806 Mountain Quail RdMay 9, 2025This project involves repairing a damaged sewer line. a camera inspection will be used to locate any breaks or blockages in the existing pipe. repairs will be completed using non-invasive methods and the line will be stabilized to ensure proper and long-lasting function · 137 m away