Recent · latest filing Jul 2025Residential

9916 Chukar Bnd

Austin, TX 78758

9.46 kW residential solar system permitted on Chukar Bend

Permits indicate a 9.46 kW residential solar photovoltaic system at 9916 Chukar Bend, along with work to install a 200-amp Tesla gateway and main breaker. The solar permit was filed July 17, 2025, and the electrical service permit was filed July 22, 2025; both are listed as final.

Summarized from City of Austin records · updated Jul 22, 2025

Projects
2
2 filings
Latest filing
Jul 22, 2025
since Jul 17, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Request to disconnect existing 200a service to install a 200a tesla gateway with 200a main breaker. no change to the meter can

  1. AppliedJul 21, 2025
  2. IssuedJul 22, 2025
  3. WorkJul '25 – Aug '25
  4. Final inspectionAug 18, 2025

Passed final inspection Aug 18, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Request to disconnect existing 200a service to install a 200a tesla gateway with 200a main breaker. no change to the meter can

    Request to disconnect existing 200a service to install a 200a tesla gateway with 200a main breaker. no change to the meter can

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Installation of 9.46kw solar pv system

    Installation of 9.46kw solar pv system

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 9916 Chukar Bnd

What is being built at 9916 Chukar Bend?

City of Austin permits indicate a 9.46 kW residential solar PV system and related electrical service work. The permits were filed July 17 and July 22, 2025.

Is solar being installed at 9916 Chukar Bend in Austin?

Yes. Permit 2025-087127 EP, filed July 17, 2025, describes installation of a 9.46 kW solar PV system.

What electrical work was permitted at 9916 Chukar Bend?

Permit 2025-090878 EP describes disconnecting the existing 200-amp service to install a 200-amp Tesla gateway with a 200-amp main breaker. It says there is no change to the meter can.

When were the permits filed for 9916 Chukar Bend?

The solar permit was filed July 17, 2025, and the electrical service permit was filed July 22, 2025. Both are listed as final.

Is a new building being constructed at 9916 Chukar Bend?

The listed permits describe a residential solar installation and electrical service work, not construction of a new building.